100+ Free Befähigungsprüfung Ingenieurbüro Practice Questions

Prepare for the Befähigungsprüfung Ingenieurbüro (Beratende Ingenieure) (Austria) exam with instant access — no signup required.

✓ No registration✓ No credit card✓ No hidden fees✓ Start practicing immediately
100+ Questions
100% Free

Loading practice questions...

2026 Statistics

Key Facts: Befähigungsprüfung Ingenieurbüro Exam

€0

Examination Fee (1st & 2nd attempt per module since Jan 2024)

Meister- und Befähigungsprüfungs-Finanzierungsgesetz / Allgemeine Prüfungsordnung

NQR 7

National Qualifications Framework Level

Befähigungsprüfungsordnung 2026 / Qualifikationsregister

3 Modules

Modular structure, each with a written and an oral Gegenstand

Befähigungsprüfungsordnung 2026 § 4 Abs. 1 (WKO)

120 / 140 Min

Written Gegenstand: design time and hard stop, per module

Befähigungsprüfungsordnung 2026 §§ 7, 10, 13 Abs. 3

30-40 Min

Oral Prüfungsgespräch per module (after 10-15 min preparation)

Befähigungsprüfungsordnung 2026 §§ 8, 11, 14 Abs. 3

3–6 Years

Professional Practice Requirement (FH/Uni 3 years vs HTL 6 years)

Ingenieurbüro-Verordnung BGBl. II Nr. 399/2008 / Fachverband Ingenieurbüros

3 Years

Statutory Warranty for Immovable Works

ABGB § 933 Abs. 1

10 Days

Electronic Standstill Period under BVergG 2018

BVergG 2018 § 144 Abs. 1

180 ECTS

Minimum FH/university degree credit requirement

Fachverband Ingenieurbüros Berufszugang / Ingenieurbüro-Verordnung

The Austrian Befähigungsprüfung Ingenieurbüro is the statutory trade licensing exam under § 134 GewO 1994 (NQR Level 7) across 3 modules: project planning/supervision, expert witness practice, and business management/law.

Sample Befähigungsprüfung Ingenieurbüro Practice Questions

Try these sample questions to test your Befähigungsprüfung Ingenieurbüro exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.

1Under § 134 of the Austrian Trade Code (Gewerbeordnung 1994 - GewO), which activity is strictly within the statutory professional scope of an Ingenieurbüro (Beratende Ingenieure)?
A.Consulting, drafting technical plans and calculations, conducting inspections/measurements, site supervision, and technical client representation before administrative authorities
B.Executing structural building construction and acting as the prime commercial contractor on the building site
C.Manufacturing, assembling, and selling engineered electrical equipment and machinery directly to end consumers
D.Performing commercial transport and operating heavy construction machinery for earthmoving operations
Explanation: Pursuant to § 134 Abs. 1 GewO 1994, the scope of a licensed Ingenieurbüro (Beratende Ingenieure) encompasses advisory work, the preparation of technical plans and calculations, the compilation of expert opinions, conducting investigations and technical measurements, supervising the execution of projects (ÖBA), and representing the client before public authorities within their certified technical discipline.
2Under the Austrian Federal Procurement Act (Bundesvergabegesetz 2018 - BVergG 2018), what is the statutory standstill period (Stillhaltefrist) before a contracting authority (Auftraggeber) may formally award a contract after sending the award decision (Zuschlagsentscheidung) electronically?
A.10 calendar days
B.14 calendar days
C.21 calendar days
D.30 calendar days
Explanation: According to § 144 Abs. 1 BVergG 2018, when using electronic means of communication, the standstill period (Stillhaltefrist) is 10 calendar days starting from the day following the electronic dispatch of the award decision (Zuschlagsentscheidung). If non-electronic delivery (e.g. postal service) is used, the standstill period is 15 calendar days.
3In ÖNORM B 2110, what is the fundamental purpose and standard percentage rate of the performance retention (Deckungsrücklass) deducted by the client from interim invoices (Abschlagsrechnungen)?
A.To provide financial security against contractual overpayments or premature contractor insolvency during construction; standard default rate is 5% of the net interim invoice amount
B.To guarantee warranty defect rectification after final acceptance; standard default rate is 2% of the final invoice amount for 3 years
C.To cover mandatory municipal withholding tax on Austrian construction wages; standard default rate is 10%
D.To insure the client against third-party environmental damages caused by site machinery; standard default rate is 15%
Explanation: Under the Sicherstellung provisions of ÖNORM B 2110 (Punkt 8.7.2), the Deckungsrücklass serves as financial security for the client during the execution phase against non-performance, overpayment, or contractor insolvency. Unless otherwise agreed in the tender documents, it is set at 5% of the net amount of each interim invoice (Abschlagsrechnung) and falls due with the final invoice, where it is released or converted into the Haftungsrücklass. It may also be replaced by a bank guarantee. Public clients frequently raise it — 10% appears in several provincial contract conditions.
4Under the Austrian Construction Site Safety Coordination Act (Bauarbeitenkoordinationsgesetz - BauKG), when must a client (Bauherr) formally designate a planning coordinator (Planungskoordinator)?
A.Whenever workers from multiple employers (mehrere Arbeitgeber) will be concurrently or consecutively active on the construction site during the planning phase
B.Only when the total gross construction investment costs exceed €5,000,000
C.Only when the construction work involves hazardous chemicals or radioactive waste disposal
D.Only when an excavation pit exceeds a vertical depth of 10 meters
Explanation: Pursuant to § 3 Abs. 1 BauKG, the client (or their project manager / Projektleiter) must appoint a planning coordinator (Planungskoordinator) during the project design and preparation stage as soon as it is foreseeable that employees of several employers (contractors/subcontractors) will be working on the site concurrently or sequentially.
5Under Austrian civil law (Allgemeines Bürgerliches Gesetzbuch - ABGB § 933 Abs. 1), what is the statutory warranty period (Gewährleistungsfrist) for defects in immovable works (unbewegliche Sachen / Bauwerke)?
A.3 years starting from the date of physical delivery/formal acceptance (Übergabe)
B.2 years starting from the date of contract signing
C.5 years starting from the date of building permit issuance (Baubewilligung)
D.30 years starting from the end of the calendar year in which construction ended
Explanation: Under § 933 Abs. 1 ABGB, the statutory warranty period for immovable assets (unbewegliche Sachen, which includes buildings, civil structures, and fixed building installations) is exactly 3 years, commencing upon formal handover/acceptance (Übergabe). For movable goods (bewegliche Sachen), the period is 2 years.
6A consulting engineer performing local site supervision (Örtliche Bauaufsicht - ÖBA) discovers that structural concrete was placed during freezing temperatures without frost-protection admixtures, violating ÖNORM B 4710-1. What is the immediate professional duty of the ÖBA?
A.Document the non-compliance in the site logbook (Bautagesbericht), issue an immediate formal stop-work/rectification notice to the contractor, and notify the client in writing
B.Secretly modify the concrete delivery tickets to conceal the temperature readings from the municipal building authority
C.Instruct the drywall contractor to accelerate work to cover the affected concrete before laboratory testing can occur
D.Personally purchase chemical heating cables and install them on the hardened concrete at the engineer's personal expense
Explanation: The core statutory and contractual responsibility of the ÖBA is to ensure execution in accordance with approved technical plans, building codes, and ÖNORM standards. Non-compliant work must be documented in the site log, a formal rejection/rectification order must be issued to the contractor, and the principal (client) must be immediately informed to protect against structural and liability risks.
7Under ÖNORM B 2110 and § 1168a ABGB, what constitutes the contractor's statutory and contractual duty to examine and warn (Prüf- und Warnpflicht)?
A.The contractor must examine client-provided designs, specifications, site conditions, and predecessor works with the diligence of an expert and warn the client immediately in writing of any discernible defects or risks
B.The contractor is only obligated to check invoices for mathematical errors and is exempt from evaluating technical drawings
C.The contractor is only liable to warn if the client explicitly pays a dedicated inspection bonus prior to construction
D.The contractor's warning duty only applies after the completed building has suffered structural collapse
Explanation: ÖNORM B 2110, reflecting § 1168a ABGB, requires the contractor to examine client-supplied materials, execution plans, instructions, and predecessor works with professional diligence. If any errors, safety risks, or unsuitability are detected or discernible to a competent specialist, the contractor must promptly submit a written warning (Warnmeldung) to the client; otherwise, the contractor shares or assumes liability for resulting defects.
8Under the Austrian BVergG 2018, which procurement procedure allows the contracting authority to negotiate contract terms with qualified candidates following a formal call for competition?
A.Negotiated procedure with prior publication (Verhandlungsverfahren mit vorheriger Bekanntmachung)
B.Open procedure (Offenes Verfahren)
C.Restricted procedure without publication (Nicht offenes Verfahren ohne Bekanntmachung)
D.Direct award without prior notice (Direktvergabe ohne vorherige Bekanntmachung)
Explanation: Under § 31 Abs. 1 Z 3 and § 34 BVergG 2018, the negotiated procedure with prior publication (Verhandlungsverfahren mit vorheriger Bekanntmachung) is a two-stage procedure where any interested economic operator may submit a request to participate, after which invited qualified candidates submit initial tenders and negotiate the technical, financial, and legal terms.
9What is the primary technical objective of OIB Guideline 2 (OIB-Richtlinie 2), published by the Austrian Institute of Construction Engineering (Österreichisches Institut für Bautechnik)?
A.Fire safety in buildings (Brandschutz)
B.Mechanical resistance and structural stability (Mechanische Festigkeit und Standsicherheit)
C.Hygiene, health, and environmental protection (Hygiene, Gesundheit und Umweltschutz)
D.Energy economy and thermal insulation (Energieeinsparung und Wärmeschutz)
Explanation: The OIB guidelines harmonize technical building requirements across the 9 Austrian federal provinces. OIB-Richtlinie 2 specifically regulates Fire Safety (Brandschutz), establishing requirements for fire resistance classes of structural elements, escape routes, fire compartmentation (Brandabschnitte), and smoke evacuation.
10An engineering contractor submits an interim invoice for €100,000 net. The contract incorporates ÖNORM B 2110 with a standard 5% Deckungsrücklass and a 3% cash discount (Skonto) for payment within 14 days. If the client pays within 14 days, what is the exact net payment amount?
A.€92,150
B.€95,000
C.€92,000
D.€97,000
Explanation: First, deduct the 5% Deckungsrücklass: €100,000 - €5,000 = €95,000. Next, apply the 3% Skonto to the remaining eligible payable base (€95,000 * 0.03 = €2,850). The net payable amount is €95,000 - €2,850 = €92,150. (Alternatively: €100,000 * 0.95 * 0.97 = €92,150).

About the Befähigungsprüfung Ingenieurbüro Exam

The Befähigungsprüfung Ingenieurbüro (Beratende Ingenieure) is the statutory competence examination in Austria required under § 134 of the Trade Code (Gewerbeordnung 1994 - GewO) to establish and operate an independent engineering consultancy (Ingenieurbüro). Regulated by the WKO Fachverband Ingenieurbüros with a new Prüfungsordnung effective January 1, 2026, the examination is benchmarked to Level 7 of the National Qualifications Framework (NQR 7). Admission requires an accredited technical qualification (HTL-Matura, Fachhochschule, or University degree with at least 180 ECTS) and 3 to 6 years of verified professional engineering practice. The 3-module exam tests project development and site supervision (Modul 1), expert witness and forensic engineering (Modul 2), and corporate management and trade law (Modul 3). This practice question bank is an English-language multiple-choice study adaptation designed to help candidates master Austrian technical statutes, ÖNORM standards, procurement law, expert witness duties, and business calculations.

Assessment

Three separately assessed modules aligned with NQR Level 7 under the Befähigungsprüfungsordnung 2026, each comprising a written and an oral Gegenstand: 1) Modul 1: Planende und überwachende Tätigkeiten (project preparation and conception, project control, cost estimation and economic appraisal, tendering and award preparation under the Bundesvergabegesetz, permit procedures and administrative law, execution supervision, acceptance and project close-out, communication and public relations); 2) Modul 2: Sachverständigentätigkeit — introduced as an independent module in the 2026 order (evaluating complex technical questions, Befundaufnahme, establishing and documenting facts, drafting Gutachten, and representing findings before authorities and courts); 3) Modul 3: Unternehmensführung (entrepreneurship and company organisation, personnel management, bookkeeping and administration, finance and investment planning, cost accounting and controlling, fee and contract management, marketing, and workplace safety/health/environmental protection).

Time Limit

Per module: the written Gegenstand is set to be solvable in 120 minutes and is terminated after 140 minutes; the oral Gegenstand allows 10-15 minutes preparation followed by a Prüfungsgespräch of at least 30 and at most 40 minutes, held before the full examination commission. Candidates may choose the order of the modules and sit them at separate sessions.

Passing Score

Each module is assessed separately on the Austrian school grading scale ('Sehr gut' to 'Nicht genügend'). A module is passed when all of its subjects are graded at least 'Genügend' (§ 15 Abs. 2 Befähigungsprüfungsordnung 2026); the exam can also be passed 'mit gutem Erfolg' or 'mit Auszeichnung'. Only negatively graded subjects have to be repeated (§ 16). All three modules must be passed to earn the certificate.

Exam Fee

€0 for the first and second attempt at each module (federally funded since January 1, 2024 under the Meister- und Befähigungsprüfungs-Finanzierungsgesetz together with the amended Allgemeine Prüfungsordnung); statutory fees apply only to third and subsequent attempts. (Meisterprüfungsstellen der Wirtschaftskammern (WKO) & Fachverband Ingenieurbüros)

Befähigungsprüfung Ingenieurbüro Exam Content Outline

40% of this practice bank

Modul 1: Planning, Design & Site Supervision (Planende und überwachende Tätigkeiten)

Project development, BVergG 2018 public procurement procedures, ÖNORM B 2110 contract execution and Mehrkostenforderungen (MKF), site supervision (ÖBA), BauKG safety coordination, OIB guidelines, and ABGB warranty/contract law.

30% of this practice bank

Modul 2: Expert Witness & Technical Evaluation (Sachverständigentätigkeit)

Structure of expert reports (Befund und Gutachten), forensic engineering diagnostics, evidentiary preservation (Beweissicherung), SDG and GebAG regulations, and expert liability under §§ 1299 and 1300 ABGB.

30% of this practice bank

Modul 3: Business Management, Trade & Labor Law (Unternehmensführung)

Entrepreneurship and company organisation, personnel management, bookkeeping, finance and investment planning, cost accounting and controlling, fee and contract management, marketing, and workplace safety — in practice GewO 1994 § 134, UGB company forms, the Kollektivvertrag Information und Consulting applicable to Ingenieurbüros, tax and accounting (USt, reverse charge § 19 Abs. 1a, EStG, KStG), Bürostundensatz calculations, and apprentice training under BAG.

How to Pass the Befähigungsprüfung Ingenieurbüro Exam

What You Need to Know

  • Passing score: Each module is assessed separately on the Austrian school grading scale ('Sehr gut' to 'Nicht genügend'). A module is passed when all of its subjects are graded at least 'Genügend' (§ 15 Abs. 2 Befähigungsprüfungsordnung 2026); the exam can also be passed 'mit gutem Erfolg' or 'mit Auszeichnung'. Only negatively graded subjects have to be repeated (§ 16). All three modules must be passed to earn the certificate.
  • Assessment: Three separately assessed modules aligned with NQR Level 7 under the Befähigungsprüfungsordnung 2026, each comprising a written and an oral Gegenstand: 1) Modul 1: Planende und überwachende Tätigkeiten (project preparation and conception, project control, cost estimation and economic appraisal, tendering and award preparation under the Bundesvergabegesetz, permit procedures and administrative law, execution supervision, acceptance and project close-out, communication and public relations); 2) Modul 2: Sachverständigentätigkeit — introduced as an independent module in the 2026 order (evaluating complex technical questions, Befundaufnahme, establishing and documenting facts, drafting Gutachten, and representing findings before authorities and courts); 3) Modul 3: Unternehmensführung (entrepreneurship and company organisation, personnel management, bookkeeping and administration, finance and investment planning, cost accounting and controlling, fee and contract management, marketing, and workplace safety/health/environmental protection).
  • Time limit: Per module: the written Gegenstand is set to be solvable in 120 minutes and is terminated after 140 minutes; the oral Gegenstand allows 10-15 minutes preparation followed by a Prüfungsgespräch of at least 30 and at most 40 minutes, held before the full examination commission. Candidates may choose the order of the modules and sit them at separate sessions.
  • Exam fee: €0 for the first and second attempt at each module (federally funded since January 1, 2024 under the Meister- und Befähigungsprüfungs-Finanzierungsgesetz together with the amended Allgemeine Prüfungsordnung); statutory fees apply only to third and subsequent attempts.

Keys to Passing

  • Work through all 100 available questions
  • Review every answer and explanation
  • Track weak areas and revisit them
  • Use our AI tutor for tough concepts

Befähigungsprüfung Ingenieurbüro Study Tips from Top Performers

1Master the essential provisions of § 134 GewO 1994 regarding the statutory scope of consulting engineers and the clear division between advisory/supervisory services and commercial execution.
2Understand the strict procedural differences between statutory warranty (Gewährleistung, 3 years for immovable works under ABGB § 933) and tort liability for damages (Schadenersatz, 3 years from knowledge of damage and tortfeasor under ABGB § 1489).
3Learn the core elements of a technical expert opinion: strict separation between factual findings (Befund) and expert evaluation/conclusions (Gutachten), evidentiary preservation methods (Beweissicherung), and liability under §§ 1299 and 1300 ABGB.
4Memorize the key public procurement procedure types under BVergG 2018 (offenes Verfahren, nicht offenes Verfahren, Verhandlungsverfahren) and the statutory standstill period (Stillhaltefrist: 10 days for electronic communication, 15 days for postal delivery under § 144 Abs. 1).
5Practice design office hourly rate calculations (Bürostundensatz) by integrating personal cost allocations, overhead surcharges (Gemeinkostenzuschlagssatz), and billable productive hour utilization rates.
6Review the collective agreement that actually applies to Ingenieurbüros — the Kollektivvertrag für Angestellte in Information und Consulting, in force for the sector since 1 January 2020 — covering employment classifications, the 40-hour normal working week (§ 4), overtime surcharges of 50% and 100% for 20:00-06:00, Sundays and public holidays (§ 5), and the mandatory Urlaubszuschuss and Weihnachtsremuneration (§ 11).

Frequently Asked Questions

What is an Ingenieurbüro (Beratende Ingenieure) in Austria?

An Ingenieurbüro (Beratende Ingenieure) is a regulated commercial enterprise under § 94 Z 69 and § 134 of the Austrian Trade Code (Gewerbeordnung 1994 - GewO). Consulting engineers provide independent technical advice, prepare designs, calculations, and expert reports, conduct measurements and testing, supervise execution (Örtliche Bauaufsicht), and represent clients before authorities in their specialized technical discipline. Unlike contracting trades (e.g., Baumeister, Elektrotechniker), consulting engineers are strictly advisory and planning professionals and do not execute commercial construction or installation works themselves.

What is the difference between an Ingenieurbüro and a Ziviltechniker?

While both provide high-level consulting engineering services, they operate under different legal frameworks. Ingenieurbüros are regulated commercial trade enterprises under § 134 GewO 1994 and are members of the Austrian Economic Chamber (Wirtschaftskammer Österreich - WKO). Ziviltechniker (Ingenieurkonsulenten and Architekten) are liberal professionals (freie Berufe) chartered under the Ziviltechnikergesetz 2019 (ZTG 2019), hold public faith (öffentlicher Glaube), and belong to the Kammer der Ziviltechniker:innen. Both require rigorous qualification and professional practice.

What are the eligibility requirements for the Befähigungsprüfung and trade license?

Under § 134 GewO 1994 and the related qualification ordinances, obtaining the trade license requires three components: 1) Formal technical education (HTL graduation, Fachhochschule degree, or university engineering degree with at least 180 ECTS); 2) Verified professional practice in the specific technical discipline (at least 6 years for HTL graduates, or at least 3 years for FH/university graduates); and 3) Passing the Befähigungsprüfung. Candidates can take the exam before completing their full professional practice period.

What is the structure of the Befähigungsprüfung under the 2026 Prüfungsordnung?

The examination is divided into three separately assessed modules benchmarked to NQR Level 7, and each module has both a written and an oral Gegenstand — six subjects in total. Modul 1 (Planende und überwachende Tätigkeiten) covers project preparation, planning, cost appraisal, tendering, permits, execution supervision and acceptance; Modul 2 (Sachverständigentätigkeit), introduced as an independent module in the 2026 regulations, focuses on Befundaufnahme, drafting Gutachten and representing them before authorities and courts; Modul 3 (Unternehmensführung) covers entrepreneurship, personnel, bookkeeping, finance, cost accounting, fees and contracts, marketing and workplace safety. Each written paper is designed for 120 minutes and stopped after 140 minutes; each oral subject allows 10-15 minutes preparation plus a 30-40 minute discussion before the full commission. Candidates choose the order of the modules.

How much does the Befähigungsprüfung cost in Austria?

Examination fees for the first and second attempt at each module of a Meister- or Befähigungsprüfung have been waived across Austria since January 1, 2024. The legal basis is the Meister- und Befähigungsprüfungs-Finanzierungsgesetz together with the amended Allgemeine Prüfungsordnung (BGBl. II Nr. 418/2023); the federal government reimburses the provincial chambers for the lost revenue. Fees under the Allgemeine Prüfungsordnung schedule — 12 percent of the reference civil-service salary for Ingenieurbüros (Beratende Ingenieure) — apply only from the third attempt onward. Note that failing to appear without a validly notified withdrawal counts as an attempt.

What role does ÖNORM B 2110 play in Austrian engineering practice?

ÖNORM B 2110 ('General contractual conditions for building works') is the primary standard contract framework in Austrian construction and engineering project delivery. It establishes detailed procedural rules for contractor warning obligations (Prüf- und Warnpflicht), formal notices and documentation for additional cost claims (Mehrkostenforderungen - MKF), site risk allocation, performance acceptance (Abnahme), and financial retentions (Deckungsrücklass and Haftungsrücklass).

How does this practice bank adapt the Austrian Befähigungsprüfung?

The official Austrian examination is conducted in German through written papers and oral examinations before a commission, and it is not a multiple-choice exam. This question bank is an English-language multiple-choice study adaptation — not an official translation, not a format simulation, and not a substitute for the oral Prüfungsgespräch. It is designed to build mastery of the underlying Austrian statutes, ÖNORM standards, procurement rules, expert-report structure and business calculations that the official modules assess, and it retains authentic Austrian legal and technical terminology alongside English explanations and worked calculation problems.