During the pre-construction phase, what is the primary purpose of a constructability review?
Ccm Project Management
Question · Easy
Final walkthrough: the punch list
Short
Complete 2026 CCM guide: the ANSI/ISO 17024 accreditation, the CMCI experience matrix by degree, the 48-month responsible-in-charge rule, the 175-question / 240-minute computer-based exam, the 67% passing standard, $350-$450 fees, 25-point/3-year recertification, and CCM vs PMP vs PE.
Blog
An owner wants a fixed price locked in before construction starts and is willing to accept a longer front-end schedule to get it. Which delivery method fits best?
Program & Project Management
Flashcard
Which project delivery method places the owner in a single contract with a design-build entity for both design and construction services?
Delivery method named for the builder's financial exposure: the firm advises the owner during design, then commits to build for an established amount, often a guaranteed maximum price.
Guess the Term
Program & Project Management Fundamentals
1.1 Project Management Fundamentals
Study guide
Cheat sheet
What is the critical path in a project schedule?
Ccm Time Management
Question · Medium
Read the clue and guess the term in 6 tries.
Game
An owner needs construction expertise during design plus a guaranteed maximum price, but wants to keep the designer under a separate contract. What delivery method is this?
A contractor submits a claim for additional compensation due to unforeseen site conditions. What is the first step the construction manager should take?
Ccm Contract Administration
Traditional linear delivery method in which complete drawings and specifications are finished before contractors submit prices.
Which of the following is an example of a lagging indicator for safety performance?
Ccm Safety Management
The longest way home
What is the key structural difference between CMAR and Design-Build?
What is the primary purpose of a Request for Information (RFI)?
Approach built on a tri-party agreement that contractually connects owner, designer and contractor and shares risk among them.
1.2 Project Initiation & Chartering
In value engineering, what is the primary focus?
Ccm Cost Management
Swap tiles to line up three of the same term.
Term Match
A project uses one multi-party agreement where the owner, designer, and contractor share risk and reward and make decisions jointly. What delivery method is this?
Which type of insurance protects the owner against losses arising from the contractor's failure to complete the project?
Ccm Risk Management
Approach that integrates technical scope with schedule and cost objectives and quantifies progress against the plan.
Cost Management
What does a 'pay-when-paid' clause in a subcontract typically mean?
Question · Hard
In a Multi-Prime delivery arrangement, who holds the contracts with the individual trade contractors?
What is the primary goal of a quality assurance (QA) program in construction?
Ccm Quality Management
Earned-value ratio of the budgeted amount for work performed to the actual amount paid for that work; a result below 1.0 means spending is overrunning.
1.3 Scope Management & WBS
Which of the following is a direct cost?
Flip two cards at a time to find matching terms.
Term Pairs
Put these project phases in order: Construction Documents, Schematic Design, Procurement, Pre-Design, Design Development, Construction.
What is the purpose of a punch list?
Scheduling technique that calculates the longest sequence of dependent activities to find the shortest possible duration.
Time Management
In a Construction Manager at Risk (CMAR) delivery method, when is the Guaranteed Maximum Price (GMP) typically established?
What does a Work Breakdown Structure (WBS) do for a construction manager?
What is retainage in a construction contract?
Planned pause inserted into a dependency between two activities, such as waiting for concrete to cure before stripping forms.
1.4 Resource Allocation & Management
Which of the following is a key component of a Job Hazard Analysis (JHA)?
Find five hidden terms in a grid of letters.
Term Search
How does program management differ from project management on a construction assignment?
What is the purpose of liquidated damages in a construction contract?
Written question from a contractor asking to clarify a statement of work or a contract term.
Contract Administration