Job-Order and Process Costing
Key Takeaways
Job-order costing traces costs to specific jobs or batches; used for custom/unique products.
Process costing averages costs across homogeneous units; used for mass production.
Equivalent units measure the work done on partially completed units.
FIFO method separates beginning inventory costs from current period costs.
Weighted average method combines beginning inventory and current period costs.
Quick Answer: Job-order costing assigns costs to specific jobs/batches for custom products. Process costing averages costs across equivalent units for mass production. FIFO separates beginning inventory from current costs; weighted average combines them. Equivalent units convert partial work into full-unit equivalents.
The choice between job-order and process costing depends on the nature of production. Custom products use job costing; homogeneous mass production uses process costing.
Job-Order Costing System
Job-order costing is used when products are distinct and identifiable—each job can be separately tracked.
When to Use Job-Order Costing
| Industry | Examples |
|---|---|
| Construction | Building projects, custom homes |
| Manufacturing | Custom machinery, special orders |
| Professional Services | Accounting engagements, legal cases |
| Printing | Custom print jobs, specialized publications |
| Healthcare | Individual patient treatments |
Job Cost Sheet
Each job has a job cost sheet that accumulates:
| Cost Component | How Tracked |
|---|---|
| Direct Materials | Materials requisition forms |
| Direct Labor | Time tickets/labor cards |
| Manufacturing Overhead | Predetermined overhead rate |
Predetermined Overhead Rate (POHR)
Since actual overhead isn't known until period-end, manufacturers use a predetermined overhead rate calculated at the beginning of the year:
Formula:
POHR = Estimated Total MOH ÷ Estimated Total Allocation Base
Common Allocation Bases:
- Direct labor hours
- Direct labor cost
- Machine hours
- Direct materials cost
Example:
Estimated MOH = \$500,000
Estimated DL Hours = 25,000 hours
POHR = \$500,000 ÷ 25,000 = \$20 per DL hour
Applied vs. Actual Overhead
| Term | Definition |
|---|---|
| Applied Overhead | POHR × Actual allocation base |
| Actual Overhead | Real overhead costs incurred |
| Overapplied | Applied > Actual (credit balance) |
| Underapplied | Applied < Actual (debit balance) |
Disposing of Over/Underapplied Overhead:
- Close to COGS (most common, if immaterial)
- Prorate to WIP, FG, and COGS (if material)
Job Costing Example
| Job #101 | Amount |
|---|---|
| Direct Materials | $5,000 |
| Direct Labor (100 hrs × $25) | $2,500 |
| Applied Overhead (100 hrs × $20) | $2,000 |
| Total Job Cost | $9,500 |
Process Costing System
Process costing is used for homogeneous, mass-produced products where individual units are indistinguishable.
When to Use Process Costing
| Industry | Examples |
|---|---|
| Chemical | Paints, fertilizers, plastics |
| Food/Beverage | Soft drinks, canned goods |
| Petroleum | Gasoline, oil products |
| Paper | Newsprint, cardboard |
| Textiles | Fabric, thread |
Key Concepts in Process Costing
Equivalent Units (EU): Convert partially completed units to the equivalent number of completed units.
Equivalent Units = Physical Units × Percentage Complete
Example: 1,000 units that are 40% complete = 400 equivalent units
Process Costing Methods
| Method | Beginning WIP Treatment | When to Use |
|---|---|---|
| Weighted Average | Combined with current costs | Simpler, common practice |
| FIFO | Kept separate from current costs | More accurate, changing costs |
Weighted Average Method
The weighted average method combines beginning WIP costs with current period costs.
Steps for Weighted Average:
Step 1: Physical Flow of Units
Units to Account For = Beginning WIP + Units Started
Units Accounted For = Units Completed + Ending WIP
Step 2: Calculate Equivalent Units
EU = Units Completed + (Ending WIP × % Complete)
Step 3: Calculate Cost per Equivalent Unit
Cost per EU = (Beginning WIP Cost + Current Period Cost) ÷ Total EU
Step 4: Assign Costs
Cost of Completed Units = Units Completed × Cost per EU
Cost of Ending WIP = EU in Ending WIP × Cost per EU
Weighted Average Example
| Data | Materials | Conversion |
|---|---|---|
| Beginning WIP (2,000 units, 100% materials, 60% conversion) | ||
| Beginning WIP costs | $10,000 | $6,000 |
| Units started | 8,000 | |
| Current period costs | $40,000 | $54,000 |
| Units completed | 7,000 | |
| Ending WIP (3,000 units, 100% materials, 40% conversion) |
Equivalent Units (Weighted Average):
| Materials | Conversion | |
|---|---|---|
| Completed | 7,000 | 7,000 |
| Ending WIP | 3,000 × 100% = 3,000 | 3,000 × 40% = 1,200 |
| Total EU | 10,000 | 8,200 |
Cost per Equivalent Unit:
Materials: (\$10,000 + \$40,000) ÷ 10,000 = \$5.00 per EU
Conversion: (\$6,000 + \$54,000) ÷ 8,200 = \$7.317 per EU
FIFO Method
FIFO separates beginning WIP costs from current period costs, providing more accurate current-period cost information.
Steps for FIFO:
Step 1: Physical Flow (same as weighted average)
Step 2: Calculate Equivalent Units
EU = Work to complete Beginning WIP + Units Started and Completed + Ending WIP
Step 3: Calculate Cost per EU (current period only)
Cost per EU = Current Period Costs ÷ FIFO Equivalent Units
Step 4: Assign Costs
- Beginning WIP costs flow out first
- Current costs applied to remaining work
FIFO Example (Same Data)
Equivalent Units (FIFO):
| Materials | Conversion | |
|---|---|---|
| Complete Beginning WIP | 2,000 × 0% = 0 | 2,000 × 40% = 800 |
| Started and Completed | 5,000 | 5,000 |
| Ending WIP | 3,000 × 100% = 3,000 | 3,000 × 40% = 1,200 |
| Total EU | 8,000 | 7,000 |
Cost per Equivalent Unit (Current Period Only):
Materials: \$40,000 ÷ 8,000 = \$5.00 per EU
Conversion: \$54,000 ÷ 7,000 = \$7.714 per EU
Cost Reconciliation
A cost reconciliation verifies that total costs to account for equal total costs accounted for:
Costs to Account For = Beginning WIP + Current Period Costs
Costs Accounted For = Completed Units + Ending WIP
These amounts must balance—this is a critical check in process costing.
Comparing Job-Order and Process Costing
| Characteristic | Job-Order | Process |
|---|---|---|
| Product Type | Custom, unique | Homogeneous, mass |
| Cost Accumulation | By job | By department/process |
| Cost Object | Individual job | Equivalent units |
| Documents | Job cost sheets | Production reports |
| Industries | Construction, custom manufacturing | Chemicals, food, petroleum |
A company estimated manufacturing overhead of $600,000 and 40,000 direct labor hours for the year. If a job used 500 direct labor hours, what is the applied overhead for that job?
$6,000
$7,500
$12,000
$15,000
Using the weighted average method, if a department has 5,000 units completed and transferred out, and 2,000 units in ending work-in-process that are 70% complete for conversion costs, what are the equivalent units for conversion costs?
5,000 units
5,700 units
6,400 units
7,000 units
Which costing system would be most appropriate for a custom furniture manufacturer?
Process costing with FIFO
Process costing with weighted average
Job-order costing
Activity-based costing
If actual manufacturing overhead is $450,000 and applied manufacturing overhead is $480,000, the overhead is:
Underapplied by $30,000
Overapplied by $30,000
Underapplied by $480,000
Overapplied by $450,000
Sections you finish are checked off in the contents.