Key Facts: Korea Cost Analyst (원가분석사) Exam
5 Subjects / 150 Min
Integrated Examination Format
Korea Cost Management Association Regulations
40% / 60%
Passing Requirement: 40% Floor & 60% Overall Average
Korea Cost Management Association Certification Standards
KRW 50,000
Official Written Examination Registration Fee
Korea Cost Management Association Portal
MOEF / PPS Norms
Statutory Procurement Framework (State Contract Act)
Ministry of Economy and Finance Contract Price Calculation Rules
Max 8% Admin / 25% Profit
Manufacturing Procurement Statutory Ceilings
Contract Price Calculation Rules Article 8 & 10
90 Days / 3% Fluctuation
Inflation Price Adjustment (ESC) Thresholds
State Contract Act Enforcement Decree Article 64
The Korea Cost Analyst (원가분석사) exam certifies professional competency in government procurement cost estimation, manufacturing and construction overhead allocation, software function point analysis, and public contract price escalation regulations under Korean statutory norms.
Sample Korea Cost Analyst (원가분석사) Practice Questions
Try these sample questions to review concepts for the Korea Cost Analyst (원가분석사) exam. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1Under the Conceptual Framework for Financial Reporting (재무보고를 위한 개념체계) under K-IFRS, which pair of qualities constitutes the fundamental qualitative characteristics (근본적 질적특성) of useful financial information?
2Which of the following cost formulas for inventory valuation is explicitly prohibited under Korean International Financial Reporting Standards (K-IFRS 제1002호 재고자산)?
3Which set represents the complete package of financial statements (전체 재무제표) required under K-IFRS IAS 1 (재무제표 표시)?
4A company holds 1,000 units of finished goods inventory costing KRW 100,000 each. At year-end, the estimated selling price is KRW 110,000 per unit, estimated completion costs are KRW 15,000 per unit, and estimated selling expenses are KRW 5,000 per unit. What is the valuation loss on inventory (재고자산평가손실) to recognize under the lower-of-cost-and-net-realizable-value rule (저가법)?
5Under K-IFRS IAS 16 (Property, Plant and Equipment / 유형자산), which of the following costs must be included in the initial acquisition cost (취득원가) of manufacturing machinery?
6An entity acquires specialized testing equipment on January 1, 2024, for KRW 50,000,000. The estimated useful life is 5 years, and the estimated residual value is KRW 5,000,000. Using the double declining balance method (정률법/이중체감법, rate = 2 / 5 = 40%), what is the depreciation expense for Year 2 (2025)?
7When an entity adopts the revaluation model (재평가모형) for property, plant, and equipment under K-IFRS IAS 16, how is an initial upward revaluation surplus (재평가잉여금) accounted for?
8Under K-IFRS IAS 38 (Intangible Assets / 무형자산), which of the following statements correctly distinguishes research expenditures (연구비) from development expenditures (개발비)?
9Which of the following three conditions MUST all be satisfied simultaneously to recognize a provision (충당부채) on the balance sheet under K-IFRS IAS 37 (충당부채, 우발부채 및 우발자산)?
10On January 1, 2024, an entity issued 3-year bonds payable with a face value of KRW 10,000,000, an annual coupon rate of 8% (payable annually on December 31), and an effective market interest rate of 10%. The issue price was KRW 9,502,600. Using the effective interest method (유효이자율법), what is the bond discount amortization (사채할인발행차금 상각액) for the first year ended December 31, 2024?
About the Korea Cost Analyst (원가분석사) Exam
The Korea Cost Analyst (원가분석사) qualification is South Korea's premier professional certification for experts conducting cost estimation, estimated price determination (예정가격 작성), and contract price adjustments for public procurement, government contracts, defense acquisitions, and major engineering and construction projects under the State Contract Act and Local Contract Act.
Exam sponsor: Korea Cost Management Association (한국원가관리협회). The requirements and fees below concern the certification or admission exam, separate from our free practice resources.
Assessment
5 subjects: Financial Accounting (재무회계), Cost & Managerial Accounting (원가관리회계), Manufacturing Cost Practice (제조원가계산실무), Construction & Service Cost Practice (공사 및 용역원가계산실무), Cost Regulations & Systems (원가관련법규 및 계약제도); 100 points each, sat in a single 150-minute examination.
Time Limit
250 minutes of testing across 5 subjects (50 minutes each, 09:30-14:50 with a 30-minute break)
Passing Score
40% minimum per subject (과락 40점) and 60% overall average (평균 60점 이상)
Fees, eligibility, and exam policies can change. Confirm them with the exam sponsor before applying or paying.
Our practice resources: topics covered
We aim to reflect publicly available exam outlines and topic information in our study resources. Coverage, format, and difficulty may differ from the actual exam, and we cannot guarantee that every detail is accurate or current. Confirm exam requirements, fees, and policies with the official exam sponsor.
Subject 1: Financial Accounting (재무회계)
Covers financial accounting concepts, qualitative characteristics under K-IFRS, balance sheet and comprehensive income presentation, inventory cost formulas (FIFO, weighted average) and lower-of-cost-and-NRV evaluation, property, plant, and equipment (PPE) acquisition costs, depreciation methods (straight-line, declining balance, sum-of-years-digits), provisions and contingent liabilities, bonds payable amortization under the effective interest method, equity classification, K-IFRS 1115 5-step revenue recognition, percentage-of-completion construction accounting, statement of cash flows, and financial ratio analysis for pre-qualification in public tenders.
Subject 2: Cost and Managerial Accounting (원가관리회계)
Covers cost classifications (direct, indirect, fixed, variable, sunk, and opportunity costs), high-low mixed cost estimation, predetermined manufacturing overhead allocation in job-order costing, weighted-average and FIFO process costing equivalent unit calculations, normal vs abnormal spoilage, joint product and by-product cost allocation (NRV method), activity-based costing (ABC) cost hierarchy, absorption vs variable costing net income differences, standard costing variance analysis (direct materials price/quantity and direct labor rate/efficiency variances), and cost-volume-profit (CVP) break-even analysis, margin of safety, and special decision making.
Subject 3: Manufacturing Cost Practice (제조원가계산실무)
Focuses on government procurement manufacturing cost estimation under the State Contract Act Enforcement Decree and Contract Price Calculation Rules: direct vs indirect materials, scrap value deduction, wage survey rate application (중소제조업 직종별 임금조사), statutory bonus caps (400%) and severance allowance (1/12), indirect labor ratios, statutory manufacturing expense items (depreciation, power, transport, outsourcing fees), general administrative expense ratio ceiling (8%), profit calculation formula and ceiling (25% strictly excluding material costs), imported goods costing, and defense procurement allowable cost principles.
Subject 4: Construction and Service Cost Practice (공사 및 용역원가계산실무)
Covers pure construction cost breakdown (materials, labor, expenses), standard production rates (표준품셈) vs standard market unit prices (표준시장단가), statutory social insurance contributions (health, pension, employment, industrial accident) and mandatory post-settlement, occupational safety and health management expenses (산업안전보건관리비), general administrative expense cap (6%) and profit cap (15%) for construction, academic research service costing and non-profit rules, engineering service cost-plus-fixed-fee method (제경비 110-120%, 기술료 20-40%), software development function point (FP) estimation, and general service costing.
Subject 5: Cost Regulations and Contract Systems (원가관련법규 및 계약제도)
Examines South Korean public contracting statutes: State Contract Act and Local Contract Act frameworks, open vs restricted vs private contract (수의계약) standards and monetary thresholds, estimated price (예정가격) confidentiality and calculation rules, multiple preliminary prices (복수예비가격) selection, qualification examination system (적격심사제) scoring, comprehensive evaluation bidding, bid/contract guarantees and forfeiture, liquidated damages for delay (지체상금), contract price escalation due to inflation (물가변동 조정 90 days / 3%), design change price adjustments, Subcontracting Fairness Act protections, direct payment requests, and illegal bidder sanctions.
Preparing for the Korea Cost Analyst (원가분석사) Exam
What You Need to Know
- Passing score: 40% minimum per subject (과락 40점) and 60% overall average (평균 60점 이상)
- Assessment: 5 subjects: Financial Accounting (재무회계), Cost & Managerial Accounting (원가관리회계), Manufacturing Cost Practice (제조원가계산실무), Construction & Service Cost Practice (공사 및 용역원가계산실무), Cost Regulations & Systems (원가관련법규 및 계약제도); 100 points each, sat in a single 150-minute examination.
- Time limit: 250 minutes of testing across 5 subjects (50 minutes each, 09:30-14:50 with a 30-minute break)
- Exam / certification fees: KRW 50,000 Official sources
Using Our Practice Resources
- Work through all 100 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
Korea Cost Analyst (원가분석사): Suggested Study Strategy
Frequently Asked Questions
What is the Korea Cost Analyst (원가분석사) certification and what organization administers it?
The Korea Cost Analyst (원가분석사) is an authoritative professional qualification in South Korea administered by the Korea Cost Management Association (한국원가관리협회 / costanalyst.or.kr). It certifies that a professional possesses specialized knowledge and practical competence in calculating estimated prices (예정가격), auditing manufacturing and construction costs, and executing contract price adjustments for public procurement projects under the State Contract Act and Local Contract Act.
What is the examination structure, subject lineup, and passing criteria?
The examination consists of 5 integrated subjects: 1. Financial Accounting (재무회계), 2. Cost & Managerial Accounting (원가관리회계), 3. Manufacturing Cost Practice (제조원가계산실무), 4. Construction & Service Cost Practice (공사 및 용역원가계산실무), and 5. Cost Regulations & Systems (원가관련법규 및 계약제도). Each subject carries 100 points. To pass, candidates must score at least 40 points in every individual subject (과락 40점 미만 방지) and achieve an overall arithmetic average of 60 points or higher across all 5 subjects.
What is the legal framework governing cost calculation in South Korean public procurement?
Public procurement cost estimation is strictly governed by the Act on Contracts to which the State is a Party (국가를 당사자로 하는 계약에 관한 법률), its Enforcement Decree (시행령), and the Contract Price Calculation Rules (계약예규 원가계산에 의한 예정가격 작성준칙) issued by the Ministry of Economy and Finance (기획재정부). These regulations prescribe exact formulas, expense categories, overhead ratios, statutory fee ceilings, and price escalation mechanisms.
How are statutory overheads, general administrative expenses, and profits capped in government cost estimation?
Under the Ministry of Economy and Finance Contract Price Calculation Rules: for manufacturing, general administrative expenses are capped at 8% of total manufacturing cost, and profit is capped at 25% of the sum of labor, expenses, and general administrative expenses (material costs are strictly excluded from the profit base). For construction, general administrative expenses are capped at 6% of pure construction cost, and profit is capped at 15% of the sum of labor, expenses, and general administrative expenses.
How does contract price adjustment due to inflation (물가변동으로 인한 계약금액 조정 / ESC) work in South Korea?
Under Article 64 of the State Contract Act Enforcement Decree, contract price escalation requires satisfying two cumulative criteria: at least 90 calendar days must have elapsed since the contract execution date (or previous adjustment date), and the overall price fluctuation rate must be 3% or greater. Adjustments can be calculated using either the Total Item Fluctuation Method (품목조정율) or the Index Escalation Method (지수조정율), applied solely to the remaining unperformed balance of the contract.
Why is this OpenExamPrep practice bank presented in English with Korean technical terms?
While the official examination in South Korea is administered in Korean, this OpenExamPrep module is designed to provide comprehensive, bilingual training for international financial analysts, defense procurement auditors, overseas contractors bidding on Korean public infrastructure, and domestic professionals seeking global terminology mastery. Key statutory concepts (e.g., 예정가격, 원가계산에 의한 예정가격 작성준칙, 산업안전보건관리비, 수의계약, 기능점수) are embedded in exact Korean alongside English explanations.