Key Facts: Juru Ukur Konstruksi Exam
4
Official Competency Units
LSP ATAKI and BNSP
Rp 450.000
Online Assessment Fee
LSP ATAKI
24
Questions in this independent bank
OpenExamPrep inventory
This bank provides 24 independent English MCQs across SI163008's four units. It reviews concepts only and does not simulate the scheme's possible oral, written, demonstration, or simulation evidence.
Sample Juru Ukur Konstruksi Practice Questions
Try these sample questions to review concepts for the Juru Ukur Konstruksi exam. Each question includes a detailed explanation. Start the interactive quiz above for the full 24+ question experience with AI tutoring.
1Which personal protective equipment (APD) set best addresses visibility, head-impact, and foot hazards for a juru ukur working near active heavy equipment?
2A project's approved safety plan classifies a deep trench as permit-controlled and requires verified shoring before entry. What must the juru ukur confirm before entering to set an invert stake?
3What immediate action should a surveying crew take if a sudden tropical rainstorm triggers severe lightning while they are setting control points in an open paddy field?
4What is the primary function of a Job Safety Analysis (JSA / Analisis Keselamatan Pekerjaan) prepared by a survey team before beginning high-risk staking out?
5In the hierarchy of hazard controls (Hirarki Pengendalian Bahaya) applied to surveying near active earthmoving machinery, which measure provides the highest level of protection?
6What is the primary safety purpose of conducting a daily 'Toolbox Meeting' (safety briefing) before the survey team disperses across a major civil construction site?
7What is the primary rule for verbal radio communication (Handy Talky / HT) when transmitting leveling staff readings between surveyor and bookkeeper?
8Why is the three-way communication technique (readback verification) essential between the instrument surveyor and the field bookkeeper?
9What immediate technical communication should occur if a surveyor realizes halfway through a traverse that the backsight prism was set over the wrong benchmark pin?
10What is the primary technical objective of a morning briefing conducted by the juru ukur for the survey field team?
About the Juru Ukur Konstruksi Exam
Juru Ukur Konstruksi (Jenjang 3, scheme SI163008) is an active LSP ATAKI qualification with four units: applying K3L, communicating in measurement, preparing measurement work, and preparing the final measurement report.
Exam sponsor: LSP ATAKI Konstruksi Indonesia under BNSP licensing and LPJK registration. The requirements and fees below concern the certification or admission exam, separate from our free practice resources.
Assessment
Delivery is available online, offline, or onsite. The published unit guides allow oral or written questions and practical demonstration or simulation; LSP ATAKI does not publish one fixed SI163008 method mix.
Time Limit
Not published in the current official sources reviewed
Passing Score
Competency decision; numeric pass mark not published
Reported exam pass rate: Not published. Exam sponsor website
Fees, eligibility, and exam policies can change. Confirm them with the exam sponsor before applying or paying.
Official sources
- LSP ATAKI — Skema Sertifikasi Juru Ukur Konstruksi (SI163008) · Source checked 2026-09-13
- BNSP — LSP ATAKI Konstruksi Indonesia · Source checked 2026-09-13
- Kepmenaker No. 158 Tahun 2024 — current construction-surveyor SKKNI · Source checked 2026-09-13
Our practice resources: topics covered
We aim to reflect publicly available exam outlines and topic information in our study resources. Coverage, format, and difficulty may differ from the actual exam, and we cannot guarantee that every detail is accurate or current. Confirm exam requirements, fees, and policies with the official exam sponsor.
M.71TPU00.001.2 — Applying K3L at the Workplace
Hazard recognition, selected controls, APD, emergency response, JSA, and briefings.
M.71TPU00.002.2 — Communication in the Measurement Process
Numeric readback, team roles, error escalation, briefings, and controlled revisions.
M.71TPU00.003.2 — Pre-Measurement Preparation
Work scheduling, preliminary field survey, equipment checks, control verification, transport, and data preparation.
M.71TPU00.004.2 — Preparing the Final Measurement Report
Traceable records, complete reports, as-built purpose, archives, review, and rejected observations.
Preparing for the Juru Ukur Konstruksi Exam
What You Need to Know
- Passing score: Competency decision; numeric pass mark not published
- Assessment: Delivery is available online, offline, or onsite. The published unit guides allow oral or written questions and practical demonstration or simulation; LSP ATAKI does not publish one fixed SI163008 method mix.
- Time limit: Not published in the current official sources reviewed
- Exam / certification fees: Rp 450.000 (daring) / Rp 600.000 (luring) Official sources
Using Our Practice Resources
- Work through all 24 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
Juru Ukur Konstruksi: Suggested Study Strategy
Frequently Asked Questions
What is the official scheme code and level?
The scheme code is SI163008, registered at KKNI Jenjang 3 (Technician level) by LSP ATAKI Konstruksi Indonesia under BNSP.
What are the published assessment fees?
The official fee published by LSP ATAKI is Rp 450.000 for online (daring) assessment and Rp 600.000 for offline (luring) assessment.
What four competency units are assessed?
The units are M.71TPU00.001.2 (K3L in workplace), M.71TPU00.002.2 (Communication during measurement), M.71TPU00.003.2 (Pre-measurement preparation), and M.71TPU00.004.2 (Final measurement report).