A contract lists "install 3/4-inch plywood subfloor, self-leveling underlayment, and nail-down oak, and replace two rotted 2x10 floor joists." The bidder holds only FLR. Which statement is correct?
- AThe entire contract is within FLR because every item supports the hardwood installation
- BPlywood subfloor, leveling, and oak are within FLR; the joist replacements are not
- COnly the oak is within FLR; subfloor and leveling require a concrete or carpentry special…
- DNone of the work is within FLR because hardwood requires the FIN specialty exclusively