A low-pressure natural-gas system has a 40,000 Btu/h water heater, an 80,000 Btu/h furnace, and a 65,000 Btu/h range. Gas is 1,000 Btu/ft³. Using the longest-length method and Table 402.4(2) capacities at 50 feet (3/4 inch = 151 cfh, 1 inch = 284 cfh), what size Schedule 40 steel main is required from the meter?
- A1/2 inch
- B3/4 inch
- C1 inch
- D2 inch