Per 2018 UPC Section 1213.3 (and the parallel 2018 UMC Chapter 13 rule), a new low-pressure industrial fuel-gas system that is not welded and will operate at not more than 14 inches water column shall stand an air, CO2, or nitrogen test of not less than:
- A3 psi for 10 minutes
- B10 psi for not less than 15 minutes with no perceptible drop
- C60 psi for 30 minutes
- DWorking pressure only, held for 5 minutes