Per IBC 2018 Section 2508.2.1, when may gypsum wallboard, gypsum lath, or gypsum plaster be installed?
- AOnly after weather protection for the installation is provided
- BAs soon as the roof sheathing is nailed, even if the building is open to rain
- CAny time the ambient temperature is above freezing
- DImmediately after concrete is placed, while the slab is still curing wet