On an erection drawing, what does the designation W16×36 identify?
Materials
Question · Easy
Six feet: a hard-hat anthem
Short
What is the standard trade weight of a 1 in. thick carbon-steel plate per square foot?
A W16×36 beam is 40 ft long. What is its theoretical piece weight before fittings?
Question · Medium
Trades Exam Prep Podcast
Listen on Spotify
Podcast
Estimate the weight of a 1/2 in. thick steel plate that is 4 ft wide by 8 ft long.
What unit weight do erectors use for carbon structural steel when converting volume to pounds?
A lift includes six W14×82 columns, each 28 ft long, and eight W18×50 beams, each 30 ft long. Ignoring fittings, what is the combined steel weight?
Question · Hard
What is the standard end-bearing seat depth of a K-series steel joist so that joist tops align regardless of joist depth?
A 40 ft by 50 ft bay uses open-web joists spanning 40 ft at 5 ft on center, with a joist at each supporting girder. How many joists are required?
What is the typical coverage width of Type B steel roof deck used for sheet-count takeoffs?
A 90 ft by 120 ft roof uses Type B deck with 36 in. coverage. Sheets are 30 ft long and run the 120 ft direction. Ignoring waste and end-lap extra, how many sheets are required?
Compared with K-series joists, LH- and DLH-series joists are selected primarily because they can provide which combination?
What is the theoretical weight of a 3/4 in. steel plate that is 5 ft wide by 10 ft long?
A 90 ft by 120 ft roof takes 120 sheets of Type B deck at 36 in. coverage and 30 ft lengths. Add 5 percent waste for cuts and damaged sheets. How many sheets should be ordered?
Under NMAC 14.6.6, which work is outside the GS-24 Structural Steel Erection classification?
In OSHA Subpart R terms, what is a steel joist girder?
A 3/4 in. plate measures 36 in. by 96 in. Using 40.8 lb/sq ft per inch of thickness, what is its theoretical weight?
How does OSHA Subpart R distinguish a steel joist from a steel truss?
OSHA Table A lists 32-0 for a 16K5 joist and NM for a 16K6. A 16K5 will span 34 ft-0 in. What erection-bridging action is required before the hoisting cables may be released?
What feature distinguishes composite floor deck from typical painted roof deck?
A cambered steel joist arrives with noticeable upward bow. What is the correct erection practice?
Sixteen joists weighing 14 lb/ft will each span 40 ft. What is the total joist steel weight before bridging and seats extras?
An erection drawing calls for an L4×4×3/8. What material is being shipped?
A shipping list shows PL 3/4 × 12 × 1-6. How should the erector read that plate?
How many 20 ft pieces of W12×26 are needed to furnish 160 linear feet of that mark, with no waste?
A lift contains six W21×44 beams, each 32 ft long, plus eight 1 in. base plates that are 2 ft by 2 ft. What is the combined theoretical steel weight?
Under OSHA 1926.753, what is the maximum number of members that may be hoisted in one multiple lift?
Rigging
How far apart must members on a multiple-lift rigging assembly be rigged?
A 4,000 lb beam is hung on a two-leg bridle with each sling at 60 degrees from horizontal. Ignoring hitch and D/d reductions, what is the tension in each sling?
A 6,000 lb load hangs on a two-leg bridle with each sling at 30 degrees from horizontal. What is the tension in each sling?
Who must inspect the rigging used in steel erection, and when?
A 10,000 lb girder is slung on a two-leg bridle at 45 degrees from horizontal. What is the tension in each sling?
A 12,000 lb column is hoisted on a four-part line. Ignoring sheave friction, what is the line pull at the hoist drum?
Under OSHA 1926.751, which lift is a critical lift?
A wire-rope sling is rated 8,000 lb in a vertical hitch. Using the usual 75 percent choker reduction, what is its choker-hitch working load?
A 16,000 lb load is shared equally by a four-leg bridle with every leg at 60 degrees from horizontal. What is the tension in each leg?
In what order must a multiple lift be rigged and then set?
An 18,000 lb load is supported on a six-part line. Ignoring friction, what is the hoist-line pull?
When may the safety latch on a crane hook be deactivated during steel erection?
An 8,000 lb beam is on a two-leg bridle at 60 degrees from horizontal. What is each sling’s tension?
A 1/2 in. plate 4 ft by 10 ft (20.4 lb/sq ft) will be lifted on a two-leg bridle at 60 degrees from horizontal. What is each sling tension?
Who may be required to work directly under a suspended steel load?
In OSHA 1926.751, which device is not hoisting equipment?
What minimum safety factor must a multiple-lift rigging assembly provide for all components?
A W21×62 beam 40 ft long is lifted on a two-leg bridle at 30 degrees from horizontal. What is each sling tension?
When a multiple-lift load is over the connectors, which lowering method is required?
What is the OSHA minimum number of anchor rods for a structural column?
Steel Erection