Per NMDOT 2019 Section 411.3.1, unless the manufacturer requires otherwise, hot-poured crack sealant may be placed only when which weather conditions exist?
- AAny air temperature as long as the sealant is heated to 500 °F
- BAir at least 40 °F and rising, pavement surface above 32 °F, and the surface dry
- CDuring rain, provided a blotter sand is broadcast immediately
- DOnly when the pavement surface is below freezing so the crack is wide open