After a water, sewer, or gas pipe is set on bedding in an open-cut trench, the material compacted from the invert up around the haunches and usually to at least the springline (often to 6 to 12 inches over the crown, per the specification) is called:
- AHaunching and initial backfill in the pipe zone
- BThe final wearing course of street pavement
- CUncompacted native spoil dumped in one lift from the top of the trench
- DA surface dressing applied only after traffic is restored