Which best describes the scope of a Florida Certified Structural Aluminum or Screen Enclosure Specialty Contractor?
Fundamentals Of Structural Aluminum And Screen Enclosures
Question · Easy
What a Safety Data Sheet tells you
Short
Which project is OUTSIDE the CILB Structural Aluminum or Screen Enclosure specialty scope?
In a screened pool enclosure, what is the structural function of the screen mesh?
Trades Exam Prep Podcast
Listen on Spotify
Podcast
What is the primary purpose of a mobile home aluminum panel roof-over?
How does a sunroom differ from a screen enclosure?
Question · Medium
Where does this beam break first?
A homeowner wants a 24 ft by 30 ft self-contained aluminum utility storage shed. Does it fall within the Structural Aluminum or Screen Enclosure scope, and why?
What characterizes a pre-formed panel post-and-beam roof in this trade?
What woodwork is permitted under the Structural Aluminum or Screen Enclosure scope?
A client asks the aluminum/screen enclosure contractor to pour a 400 sq ft standalone concrete patio with no enclosure or aluminum component. What is the correct response?
Question · Hard
OSHA fall heights, to scale
How does the residential glass and window-door enclosure scope differ from the Glass and Glazing specialty?
Which statement about Florida wind-load zones for aluminum enclosure design is correct?
Design And Engineering Principles
What is a key structural difference between an attached and a freestanding screen enclosure?
A pool enclosure has posts spaced 10 ft on center along a beam line, and the roof spans 14 ft from the house to that beam line. What is the tributary roof area carried by one interior post?
A roof section of an enclosure measures 10 ft by 12 ft. The design wind uplift pressure is 30 psf. What is the total uplift force on that roof section?
A post carries a tributary roof area of 70 sq ft. Dead load is 12 psf and live load is 20 psf. Soil bearing capacity is 2000 psf. What minimum footing area is required to support the post's gravity load?
An enclosure wall run is 40 ft long with posts placed every 8 ft, including one post at each end. How many posts are required for that wall run?
What do the span tables in the AAF Guide to Aluminum Construction in High Wind Areas provide?
What is a Notice of Acceptance (NOA) in the context of Miami-Dade product approval?
A 24 ft aluminum roof beam weighs 2.5 lb per linear foot. What is the total weight of the beam?
A gable enclosure roof has a 12 ft horizontal run and a 3 ft vertical rise. How is the roof slope correctly expressed?
How does soil bearing capacity affect footing design for an aluminum enclosure?
A simply supported aluminum beam spans 10 ft and carries a uniformly distributed load of 80 lb/ft. What is the maximum bending moment in the beam?
Under ASCE 7 as adopted by the Florida Building Code, how does an enclosed versus a partially open enclosure affect internal wind pressure design?
For a freestanding aluminum enclosure post subject to wind overturning, which design action best increases overturning resistance?
A screen wall section is 12 ft long by 8 ft high and includes one screen door measuring 3 ft wide by 7 ft high. What is the net screen mesh area required for that wall section?
On a set of enclosure plans drawn at 1/4 in = 1 ft scale, a wall measures 2.5 in on the drawing. What is the actual wall length?
Plan Reading And Estimating
What is the purpose of a submittal package in an aluminum enclosure project?
When a contractor finds conflicting dimensions between the plan and a field measurement, what document is used to request clarification from the designer or building official?
A take-off calls for 10 screen panels, each 4 ft by 8 ft. Adding a 10% waste factor, how much screen mesh should be ordered?
What information does an elevation drawing convey for an aluminum enclosure?
On a revised set of enclosure drawings, what does a revision cloud indicate?
What is the difference between an RFQ and an RFI?
Before excavating for enclosure footings, what is the first required site-preparation action?
Construction And Installation Techniques
When setting aluminum posts in concrete footings, which practice best protects against galvanic corrosion at the post base?
What is the correct sequence for fabricating and installing the main structural frame of an aluminum screen enclosure?
What is the purpose of temporary shoring during erection of an aluminum enclosure?
Which fastener material is generally appropriate for exterior aluminum enclosure connections in coastal Florida?
When attaching an aluminum enclosure to an existing residence, what must be verified at the attachment point?
A screen enclosure door is binding and will not latch. What is the most likely cause and the first adjustment to try?
Which detail is required where an aluminum roof meets a wall to prevent water intrusion?
What is the function of soffit venting in an aluminum enclosure roof?
Fascia gutters and downspouts on an aluminum enclosure must be installed to do what?
When installing a vinyl window in an aluminum enclosure wall, what must be done at the rough opening?
Which sealing product is appropriate for the joint between an aluminum beam and a concrete deck to allow for differential movement while shedding water?