During stressing of a PT slab-on-ground, the measured elongation is 15% higher than the calculated elongation. What should be done?
- AContinue stressing to full force
- BStop stressing and investigate the cause — excessive elongation may indicate strand slipp…
- CAdd more tendons
- DReduce the concrete strength