For a conventional dry pipe system outside refrigerated spaces, what is the routine trip-test interval under NFPA 25 (2023), with a partial-flow test permitted when a full-flow test is not due?
Intermediate Itm Tasks
Question · Easy
OSHA fall heights, to scale
Short
NICET ITWBS Level II Exam Guide 2026: Blueprint, References, and Field ITM Breakdown
Current NICET ITWBS Level II format, five-domain outline, permitted references, and NFPA 25 (2023) distinctions for dry systems, pumps, sprinkler sampling, obstruction work, and impairments.
Blog
Main Drain Test — Change from Baseline
Intermediate ITM Tasks
Flashcard
For a conventional dry pipe system outside refrigerated spaces, what is the routine full-flow trip-test interval under NFPA 25 (2023), in addition to testing whenever the system is altered?
Abbreviation for hard hats, eye protection, hearing protection, and gloves worn by a technician to guard against jobsite hazards.
Safety Procedures
Guess the Term
Chapter 1: Personal Safety, PPE & Equipment
1.1 PPE Requirements & Maintenance
Study guide
Cheat sheet
An approved dry-system leakage test procedure specifies an initial pressure of 40 psi and a minimum final pressure of 37 psi after 2 hours with the source isolated. What is the maximum permitted pressure loss for this test?
Read the clue and guess the term in 6 tries.
Game
Dry-Pipe Valve — Annual and Full-Flow Trip Tests
Under NFPA 25 (2023) Section 13.4.5.2.1, at what interval must the priming water level in a dry pipe valve be tested?
Safety acronym for isolating and securing electrical, mechanical, or hydraulic energy sources before servicing fire pumps or valves.
At what interval must quick-opening devices (QODs) such as accelerators and exhausters on dry pipe systems be tested under NFPA 25 (2023)?
Lockout/tagout, called like a cup final
Dry-Pipe Quick-Opening Device — Test Interval
Where a dry pipe sprinkler system is equipped with a low air pressure supervisory alarm, how often does NFPA 25 (2023) Section 13.4.5.2.6 require the alarm to be tested?
Written employer authorization document that must be completed and signed by the entry supervisor before a technician enters a hazardous confined vault or tank.
1.2 Tool Safety, Electrical Safety & Stored-Energy Hazards in Charged Piping
Under NFPA 25 (2023) Section 13.2.4, how often must gauges monitoring air or nitrogen pressure on a dry pipe system be inspected to verify normal pressure?
Swap tiles to line up three of the same term.
Term Match
Dry-Pipe Air Leakage — Two Permitted Methods
When must auxiliary drains (low-point drum drips) on a dry pipe sprinkler system be drained under NFPA 25 (2023) Section 13.4.5.3?
Portable climbing device whose side rails must extend at least 3 feet above an upper landing surface and be set at a 4-to-1 working-length angle.
A non-dwelling dry-system test uses the same normal gas pressure, test connection, and timing method as acceptance. All times below start when that connection is fully open. The investigation trigger is a total-delivery increase of at least 25%. Which interpretation is best supported? | Record | Valve trip | Water arrival | | --- | --- | --- | | Acceptance | 12 s | 40 s | | Current | 24 s | 54 s |
Question · Hard
Dry-Pipe Low-Air Alarm — Annual Operational Test
Per NFPA 25 (2023), strainers, filters, and restriction orifices inside dry pipe valves and quick-opening devices must be inspected internally and cleaned at what interval?
Defined boundary of systems, frequencies, and tasks determined during a pre-inspection review when coordinating with a customer.
Communication and documentation
1.3 Environmental Hazards, Hazardous Materials & Worksite Illumination
Under NFPA 25 (2023) Section 13.10, how must a nitrogen generator serving a dry pipe sprinkler system be maintained?
Flip two cards at a time to find matching terms.
Term Pairs
Antifreeze — Annual Test and 2023 Legacy Exception
After an authorized dry-system trip test, which restoration plan best accounts for differences among dry pipe valve models?
Question · Medium
Abbreviation for the code official, fire marshal, or agency responsible for enforcing fire protection standards and receiving notice of system shutdowns.
Under NFPA 25 (2023) Section 13.2.4, what is the required inspection schedule for pressure gauges on a wet pipe sprinkler system?
Antifreeze — Sampling and Product Compatibility
Per NFPA 25 (2023), pressure gauges must be replaced or compared with a calibrated gauge every 5 years. A gauge passes the comparison if it is accurate to within what tolerance?
Acronym for the ongoing program of visual checks, operational verification, and upkeep governed by NFPA 25.
Chapter 2: High-Hazard Safety: LOTO, Confined Space & Working at Heights
2.1 Lockout/Tagout (LOTO) Procedures
Under NFPA 25 (2023), which waterflow alarm testing schedule is correct?
Find five hidden terms in a grid of letters.
Term Search
Standpipe Hydrostatic Test — Scope and Pressure
Two wet risers share an upstream supply. The same verified instruments and drain arrangements were used for these observations; municipal operating conditions were confirmed comparable. Which follow-up best fits the pattern? | Riser | Prior static/residual | Current static/residual | | --- | --- | --- | | A | 80/60 psi | 80/43 psi | | B | 80/61 psi | 80/60 psi | A's control valve was operated during maintenance yesterday.
Permanent written or electronic log of test data, gauge pressures, valve trip times, and classified deficiencies delivered to the property owner.
An OS&Y valve maintenance instruction calls for annual full-travel operation, then return to its normal open position backed one-quarter turn to avoid jamming. Which field procedure follows that instruction?