When laying out a vertical element under EC0326, what is the mason's first step at the location where the wall, castillo, or column will be built?
- APouring a lean-concrete strip along the future wall line
- BVisibly marking the fixed and movable reference points in the sketch
- CWetting the bricks or blocks that will be used to build the wall until they are saturated
- DApplying a base coat of plaster to the adjacent wall