Which Irish statute sets out the general duties of employers and employees for health and safety on construction sites, including advanced scaffolding work?
Rules And Regulations
Question · Easy
Under which regulations is advanced scaffolding listed as a prescribed occupation requiring a SOLAS CSCS registration card in Ireland?
Question · Medium
Which body enforces health and safety legislation on Irish construction sites where advanced scaffolds are erected?
Trades Exam Prep Podcast
Listen on Spotify
Podcast
Which HSA publication is the principal Irish guidance for access and working scaffolds, referenced during the CSCS Scaffolding Advanced programme?
According to the HSA scaffold Code of Practice, which scaffold activities typically require training to an advanced scaffolder level?
The SOLAS Scaffolding Advanced candidate pack requires implementation of which documents during scaffold erection?
What is the minimum age requirement for candidates entering the SOLAS CSCS Scaffolding Advanced programme?
Who is primarily responsible for ensuring that advanced scaffold erection follows the site-specific risk assessment and method statement?
What must an employee do if they identify an immediate danger during advanced scaffold erection?
At what un-sheeted tube-and-fitting scaffold height does the HSA Code of Practice indicate advanced scaffolder competence is typically required?
Question · Hard
At what sheeted scaffold height does the HSA Code of Practice typically require advanced scaffolder competence for tube-and-fitting scaffolds?
What Irish regulations set minimum requirements for guard-rails and working platforms on scaffolds?
What is the purpose of the GA3 form in advanced scaffolding handover?
When must collective edge protection be maintained during advanced scaffold dismantling?
How many short-answer questions are on the official SOLAS Scaffolding Advanced theory test?
Cscs Scheme
What is the minimum pass mark for the Scaffolding Advanced theory test?
What happens if a candidate fails the Scaffolding Advanced theory test?
What minimum site experience is required before attending the Scaffolding Advanced programme?
Which CSCS card must a candidate hold before entering the Scaffolding Advanced programme?
How many days of training precede the theory test and practical assessments on the Advanced programme?
How many practical tests must candidates complete on the Scaffolding Advanced programme?
What is the maximum time allowed for practical test P1 (independent tied access scaffold with loading bay, ladder access, and protective fan)?
What is the maximum time for practical test P2 (cantilever access scaffold from a Class 6 loading bay)?
What is the SOLAS CSCS Scaffolding card renewal fee listed on the official SOLAS CSCS page?
What is the primary function of a needle tube in advanced scaffolding?
Scaffold Components
What are unit beams used for in advanced tube-and-fitting scaffolding?
What is a putlog coupler primarily used for?
What is the function of a swivel coupler on an advanced scaffold?
What component is used to spread load from a standard onto soft or uneven ground?
In tube-and-fitting scaffolds, what is a ledger?
What is the role of a transom on a working platform?
What are check fittings (right-angle couplers) primarily used for?
What is a gin wheel used for on advanced scaffolds?
What is the purpose of a scaffold fan (protective fan)?
Before erecting a cantilever scaffold, what must be verified about needle tubes?
Pre Use Inspection
What defect would make a timber scaffold board unfit for use on an advanced scaffold?
What should be checked on couplers before use on an advanced structure?
What PPE must conform to CE marking and applicable EC directives per the advanced candidate pack?
Before practical test P1, candidates must assess the ground or base for what purpose?
What must candidates demonstrate regarding harness use on the advanced programme?
When inspecting tubes, which condition would require withdrawal from service?
What documentation must be submitted at least two working days before the Advanced course starts?
Why must standards be secured in two directions before being released during erection?
Scaffold Stability
What is the purpose of diagonal bracing on an advanced scaffold?
When setting out a Class 6 loading bay for advanced practical tests, what dimensions are specified in the candidate pack?
What must be checked progressively as each lift of an advanced scaffold is added?
Why are ties to the building critical on an independent tied advanced scaffold?