In Lean Six Sigma, what is the primary purpose of the DMAIC approach?
Iassc Icyb Define
Question · Easy
Line up, find the middle
Short
Which statement best describes the common Six Sigma goal of reducing variation?
What does the problem-solving expression Y = f(x) mean in a Lean Six Sigma project?
Business Exam Prep Podcast
Listen on Spotify
Podcast
Which voice captures what external customers need, expect, or complain about?
What is a Critical to Quality characteristic?
Stats test: find the median
Which role most commonly serves as a part-time team member supporting Lean Six Sigma projects?
Which item is normally part of a Lean Six Sigma project charter?
Which Lean concept focuses on eliminating activities that do not add value from the customer's perspective?
Which option is one of the seven wastes listed in the IASSC Yellow Belt BoK?
In 5S, which activity is most closely associated with removing unnecessary items from the work area?
What does cost of poor quality usually include?
What is the purpose of Pareto analysis?
What does DPMO stand for?
Which phrase best describes a process?
Which tool visually groups possible causes of a problem under categories such as people, methods, machines, materials, measurement, and environment?
Iassc Icyb Measure
What does SIPOC stand for?
Which statistic is the arithmetic average of a data set?
Which statistic is the middle value when data are ordered from smallest to largest?
What does standard deviation measure?
Which chart is commonly used to show the distribution or shape of continuous data grouped into intervals?
Which term describes how close repeated measurements are to each other?
Which term describes how close a measurement is to the true or reference value?
What is process capability concerned with?
Which statement best describes a stable process?
What is the primary purpose of a control plan?
Iassc Icyb Control
Which Lean control helps signal replenishment or production based on actual demand?
What is Poka-Yoke?
Why are response plans included with control plans?
Which activity best supports sustaining 5S gains after the first cleanup?
What is the main purpose of cost-benefit analysis for a proposed control or improvement?
A customer says, "Your invoices are hard to understand and often arrive late." What is the best first Lean Six Sigma action?
Question · Medium
Which problem statement is best for a Yellow Belt project charter?
A project team is choosing among possible improvement projects. Which candidate is usually the best Lean Six Sigma fit?
Which project metric is most directly aligned to a CTQ for customers complaining about long call center waits?
A sponsor asks why a Yellow Belt team should define process boundaries before collecting detailed data. What is the best answer?
Which example best represents the Voice of the Business rather than the Voice of the Customer?
In a project team, who is usually responsible for sustaining the process after project closure?
A department fixes defects by inspecting every file at the end and sending errors back for correction. Which COPQ category is most directly represented by the correction work before delivery?
A Pareto chart of 200 complaints shows 120 billing complaints, 40 delivery complaints, 25 product complaints, and 15 website complaints. What should the team usually investigate first?
A team inspected 500 forms and found 75 total defects. What is the defects per unit (DPU)?
A team inspected 100 loan files. Each file has 5 defect opportunities, and the team found 20 defects. What is the DPMO?
A process starts with 1,000 applications and 920 pass the first review without rework. What is the first time yield?
A three-step process has first time yields of 90%, 95%, and 80%. What is the approximate rolled throughput yield?
Which example best illustrates the Lean waste of waiting?
Which example best illustrates overprocessing?