EPA Lead Inspector Certification Guide 2026: Current Fees, Dust Rules, and Exam Process
Video
Under 40 CFR 745.227, a lead-based paint inspection is defined as a surface-by-surface investigation to determine the presence of lead-based paint. What is the regulatory action level for lead-based paint under HUD and EPA standards?
Regulations And Standards
Question · Medium
Current 2026 EPA Lead-Based Paint Inspector guide covering the 24-hour course, federal application and exam process, $410 certification fee, $70 exam fee, and January 2026 dust-lead rules.
Blog
TSCA Sections 402 and 404
Regulations & Scope
Flashcard
A lead inspector's certification is governed primarily by which federal regulation?
Question · Easy
Statute whose sections 402 and 404 underlie EPA's training and certification program for lead paint work.
Regulations and Standards
Guess the Term
Chapter 1: Introduction to the EPA Lead Inspector Exam
1.1 About the EPA Lead Inspector Exam
Study guide
Cheat sheet
How many hours of training are required under 40 CFR 745 Subpart L for initial certification as a lead inspector?
Read the clue and guess the term in 6 tries.
Game
40 CFR 745 Subpart L vs. Subpart E
Which XRF analyzer type excels at lower lead concentrations but requires a larger area for measurement and is more affected by substrate type?
Xrf Instrument Operation
Question · Hard
The 1992 Housing and Community Development Act's lead-paint portion is commonly called ___ X.
When calibrating an XRF analyzer, which reference standard is used to verify instrument performance?
Target housing (lead program definition)
Under 40 CFR 745.227(d)(7), how often must an XRF performance check be conducted during an inspection?
___ housing: built before 1978, except housing for the elderly or disabled and zero-bedroom units unless a child under six lives or is expected to live there.
1.2 How to Use This Study Guide
What does NCL stand for in the context of XRF readings?
Swap tiles to line up three of the same term.
Term Match
Child-occupied facility (COF)
Which ASTM standard governs the collection of dried paint samples for laboratory analysis of lead content?
Paint Chip Sampling
Federal agency that, with EPA, issues the XRF performance sheets and publishes the guidelines inspectors follow for lead paint hazards in residences.
What laboratory analytical standard is used to determine lead concentration in paint chip samples prepared by hotplate digestion?
EPA Model Accreditation Plan (MAP)
During a lead inspection, an inspector systematically tests each distinct surface in each room. Which approach is required by 40 CFR 745.227?
Inspection Methodology
EPA rule for paid work that disturbs coatings in pre-1978 housing and child-occupied facilities, requiring certified firms and lead-safe practices.
Chapter 2: Federal Regulations, Title X, and HUD Guidelines
2.1 40 CFR Part 745 Subpart L (Federal Regulations, Accreditation, and Certifications)
What is the primary scope of a lead-based paint inspection as defined under 40 CFR 745?
Flip two cards at a time to find matching terms.
Term Pairs
What can a certified Lead Inspector determine, and what can't they determine, compared to a Risk Assessor?
Certification Disciplines
A lead inspector identifies a component with an XRF reading of 0.8 mg/cm² on a wood substrate. The instrument's performance check is within tolerance. What should the inspector do?
Handheld device whose serial number must appear in an inspection report when it is used for paint analysis.
Analyzer operation
According to HUD Guidelines Chapter 7, what must the inspector's report include?
Report Writing
Risk Assessor vs. Lead Inspector
How long must a lead inspector retain inspection records under 40 CFR 745.227(h)?
Recordkeeping
Model-specific document that lists the positive, negative and inconclusive ranges plus calibration check tolerances for an analyzer.
2.2 Title X and the 1978 Ban (Residential Lead-Based Paint Hazard Reduction Act)
What is the correct alternative to XRF testing when measuring lead content in paint by laboratory analysis?
Find five hidden terms in a grid of letters.
Term Search
Abatement Supervisor/Worker vs. Lead Inspector
During an occupant interview, why is gathering information about past renovation history important during a lead inspection?
Certified plastic film, one blank and five with known lead mass, used to validate a portable analyzer.
Which of the following building types is subject to 40 CFR 745 Subpart L lead inspection requirements?
Project Designer (lead discipline)
Loading more…