According to SIA 271, how must penetrations through flat roof waterproofing (e.g., ventilation pipes, solar conduit posts) be detailed to ensure permanent water tightness?
- AThey must be wrapped with duct tape and covered with loose gravel.
- BThey can be sealed using expanding PU foam injected around the pipe without any membrane…
- CThey must be waterproofed with a flanged sleeve or liquid plastic (FLK) rising at least 1…
- DAll roof penetrations must be welded directly to the building's structural steel rebar.