A Baupolier notices that a freshly cast slab exhibits fine, shallow, map-like cracking across the surface within 2 to 4 hours of placement on a hot, windy day. What type of defect is this, and how should it have been prevented?
- AStructural bending shear failure, prevented by increasing the concrete slab thickness by…
- BAlkali-aggregate reaction, prevented by heating the water to 90°C during batching
- CPlastic shrinkage cracking (Frühschwindrisse / Plastisches Schwinden), prevented by immed…
- DFrost heave cracking, prevented by installing underfloor heating pipes before pouring