What is the primary goal of Demand Driven Material Requirements Planning (DDMRP)?
Ddmrp Principles
Question · Easy
Which effect does DDMRP specifically aim to prevent by using decoupling points?
What are the five sequential steps of the DDMRP methodology?
Ddmrp Basics
Business Exam Prep Podcast
Listen on Spotify
Podcast
In traditional MRP, what is the primary driver for generating purchase and production orders?
What is a decoupling point in the context of DDMRP?
Strategic Inventory Positioning
Which of the following is NOT one of the three primary functions of a DDMRP buffer?
What are the three color-coded zones that make up a DDMRP buffer?
Buffer Profiles And Levels
In DDMRP, what does 'decoupled lead time' (DLT) refer to?
Question · Medium
What is the net flow equation used in DDMRP Step 4 (Demand Driven Planning)?
Demand Driven Planning
Which DDMRP buffer zone determines the average order frequency and typical order size?
A manufacturer has a product with a cumulative lead time of 45 days. After placing decoupling point buffers at two intermediate stages, the decoupled lead time is reduced to 12 days. What primary benefit does this provide?
In DDMRP, what is the purpose of the red zone in a buffer?
Which factor is NOT typically used to determine where to place decoupling points in DDMRP?
What does DDMRP mean by 'qualified demand' in the net flow equation?
In DDMRP, when does the system generate a supply order for a buffered item?
What is the yellow zone in a DDMRP buffer primarily based on?
Which of the following best describes a 'buffer profile' in DDMRP?
What is the primary purpose of dynamic adjustments in DDMRP Step 3?
Dynamic Adjustments
What is the difference between a recalculated adjustment and a planned adjustment factor in DDMRP?
In DDMRP's visible and collaborative execution (Step 5), what is the primary tool used to prioritize open supply orders?
Visible Collaborative Execution
A DDMRP buffer has: Red zone = 200 units, Yellow zone = 500 units, Green zone = 300 units. What is the top of green (TOG) for this buffer?
Using the same buffer (Red=200, Yellow=500, Green=300), the current on-hand is 150 units, on-order is 400 units, and qualified demand is 250 units. What is the net flow position?
In the scenario from the previous question (NFP=300, TOG=1000), what supply order quantity should be generated?
What is 'customer tolerance time' in the context of DDMRP positioning?
Which of the following is a key advantage of DDMRP over traditional MRP?
In DDMRP, what is 'inventory leverage' as a positioning factor?
What does the acronym DDS&OP stand for in the demand driven model?
A part has an ADU of 50 units, a DLT of 10 days, and is classified as medium variability with a lead time factor of 40% for the red zone base. What is the red zone base?
Question · Hard
What is a synchronization alert in DDMRP execution?
In DDMRP, what does 'decoupled explosion' mean?
Which green zone calculation factor produces the largest result when comparing MOQ, imposed order cycle, and lead time factor?
What is the Demand Driven Adaptive Enterprise (DDAE) model?
A company is evaluating two potential decoupling point locations. Point A has high variability and protects 3 finished goods. Point B has low variability and protects 1 finished good. Which point generally provides greater inventory leverage?
In DDMRP, what is the 'Demand Driven Operating Model' (DDOM)?
What is the primary problem with 'nervousness' in traditional MRP systems?
A buffer has the following zones: Red=150, Yellow=400, Green=250. Current on-hand is 120 units. What buffer status color would be displayed for execution priority?
What is the key difference between how DDMRP and traditional MRP handle demand variability?
A planned adjustment factor (PAF) of 1.5 is applied to a buffer for an upcoming seasonal peak. If the current buffer zones are Red=100, Yellow=300, Green=200, what will the adjusted buffer total (TOG) be?
Which of the following describes the correct relationship between the yellow zone and decoupled lead time?
What is the purpose of the 'red zone safety' component within the red zone?
In a distribution network, what problem does the 'push and promote' model create according to DDMRP principles?
What is the 'hub and spoke' positioning strategy in DDMRP distribution?
A buffer has ADU of 80 units and DLT of 15 days. What is the yellow zone size?
Which of the following is an example of a 'critical operation protection' positioning factor?
What happens when a DDMRP buffer's net flow position is ABOVE the top of green?
What is 'prioritized share' in DDMRP planning?
In a DDMRP environment, how should Average Daily Usage (ADU) ideally be calculated?