Question

A quality control engineer in an automotive parts plant discovers that a structural steering component has a fatigue failure rate exceeding safety limits under heavy vibration. The plant manager orders the shipment released to meet monthly revenue targets. In accordance with the CONFEA Code of Professional Ethics (Resolution No. 1.002/2002), what is the engineer's ethical duty?

Etica Legislacao Seguranca Sustentabilidade

Question · Easy

Question

A production plant is preparing an aggregate plan for two consecutive quarters with forecasted demand of 1,000 units in Quarter 1 and 1,600 units in Quarter 2. Initial inventory is 0 units. Regular production costs $50/unit (capacity = 1,000 units/quarter). Overtime production costs $75/unit (maximum capacity = 400 units/quarter). Subcontracting costs $90/unit. Inventory holding cost is $10/unit per quarter on ending inventory. If the company pursues a Level Strategy producing 1,300 units in regular/overtime per quarter (1,000 regular + 300 overtime each quarter) versus a Chase Strategy (Q1: 1,000 regular; Q2: 1,000 regular + 400 overtime + 200 subcontracted), what is the total cost difference between the Level and Chase strategies across both quarters?

Gestao Operacoes Sistemas Producao

Question · Hard

Question

A production engineer solves a Mixed-Integer Linear Programming (MILP) maximization problem using the Branch-and-Bound algorithm. At the root node, the continuous LP relaxation yields an objective value of Z_LP = $150,000 with fractional decision variable x_1 = 3.6. A known integer feasible solution already provides a lower bound of Z_LB = $142,000. When exploring a subproblem node B along the tree, the LP relaxation yields an objective value of Z_B = $140,500. How should the algorithm handle subproblem node B?

Pesquisa Operacional Metodos Quantitativos

Question · Medium

Loading more…