Why does ADR require a shovel, drain seal and plastic collecting container for many loads bearing labels 3, 4.1, 4.3, 8 or 9?
- ASo the driver can bury leaking packages in a field and continue the journey
- BSo spilled product can be contained, drains blocked, and residue collected instead of pol…
- CThey replace fire extinguishers on vehicles over 7.5 tonnes
- DThey are required only for Class 1 explosives, which are in the basic module