Long masonry walls exposed to large daily temperature swings, as in much of Burkina Faso, are at risk of cracking unless which measure is taken?
- AVertical movement joints and adequate chaînage are provided at suitable spacing
- BAll cement is omitted from the mortar
- CThe wall is built without foundations on shrinkable clay
- DThe roof is built with no fall and no outlets