How does the presence of overhead structures (such as buildings, gantries, or ship masts) affect portal boom crane planning?
- AIt provides useful anchor points for the crane's load lines.
- BIt creates tail swing and boom collision hazards during slewing and luffing.
- CIt increases the wind speed around the crane cabin.
- DIt requires the operator to wear a different class of safety harness.