For a CP4 designer sizing a new ICCP system on a 50 km cross-country pipeline with multiple river crossings, which design approach BEST balances performance and cost?
- AMultiple smaller distributed deep anode beds with separate rectifiers at strategic points…
- BSingle large rectifier at one end
- CGalvanic anodes only
- DBare pipe with no CP