Before placing concrete on a prepared subgrade in hot, dry weather, what should the crew typically do?
- ADampen the subgrade so it does not absorb water from the fresh concrete
- BLet the subgrade dry out completely so it bonds better
- CHeat the subgrade with propane torches
- DApply a curing compound to the subgrade