Which AACE certification is the entry-level technician credential for cost engineering practitioners with limited industry experience?
Aace Certifications
Question · Easy
Would you rather: money now or later
Short
According to AACE, which definition BEST describes cost engineering?
Supporting Skills And Knowledge
Chapter 1: AACE Certification, Ethics & Total Cost Management Framework
1.1 About the AACE CCT Exam & Certification Pathway
Study guide
Direct costs on a construction project would typically include which of the following?
Cost Estimating
Trades Exam Prep Podcast
Listen on Spotify
Podcast
Per AACE Recommended Practice 18R-97, a Class 5 estimate is BEST characterized by which level of project definition and accuracy?
Question · Medium
AACE defines contingency as an amount included in an estimate to address which of the following?
The longest way home
If $1,000 is invested today at 8% annual interest compounded annually, what is the future value at the end of 5 years (rounded)?
Engineering Economics
1.2 AACE Canons of Ethics & Professional Practice
The straight-line depreciation method for an asset with a $100,000 cost, a $10,000 salvage value, and a 9-year life produces what annual depreciation expense?
Which depreciation method depreciates assets over recovery periods (3, 5, 7, 10, 15, 20, 27.5, 39 years) using IRS-specified percentages?
A project has an initial cost of $50,000 and generates net cash inflows of $15,000 per year for 5 years. What is the simple (non-discounted) payback period?
The Net Present Value (NPV) decision rule for a single project says ACCEPT the project when:
1.3 Total Cost Management (TCM) Framework Architecture
A Work Breakdown Structure (WBS) is BEST described as:
Project Management Process
The intersection of the WBS and the Organizational Breakdown Structure (OBS) creates which of the following?
Project Cost Management
In a Critical Path Method (CPM) network, the critical path is BEST defined as:
Planning And Scheduling
Total Float for an activity is BEST calculated as:
1.4 Cost Engineering Terminology & Core Concepts
Free Float (FF) differs from Total Float (TF) in that Free Float represents:
PERT three-point estimating computes the expected activity duration using which formula?
Schedule compression by adding resources to a critical path activity to reduce its duration (typically at additional cost) is called:
Earned Value (EV) on a project is defined as:
1.5 Strategic Asset Management: Asset Performance, Assessment & Configuration Control
The Cost Performance Index (CPI) is calculated as:
A project has BAC = $1,000,000, EV = $400,000, AC = $500,000. The forecast Estimate at Completion (EAC) assuming the current CPI will continue is:
The To-Complete Performance Index (TCPI) using the original BAC is:
Question · Hard
Schedule Variance (SV) is calculated as:
Chapter 2: Elements of Cost, Labor, Materials & Indirects
2.1 Cost Classification & Cost Behavior
The 50/50 percent-complete technique credits a work package as:
The Cost Baseline is BEST defined as:
Which AACE TCM Framework process area focuses on Strategic Asset Management (SAM)?
Total Cost Management
Which of the following is a CONFORMANCE cost in Cost of Quality (COQ)?
Quality Management
2.2 Labor Costs, Craft Rates & Labor Burden
Pareto analysis in quality management states approximately:
A Wright learning curve at 85% means that:
Resource Management
Resource leveling differs from resource smoothing in that resource leveling:
Which contract type places the MOST cost risk on the seller/contractor?
Procurement
2.3 Materials & Equipment Cost Fundamentals
A Probability-Impact (P-I) matrix is used in which step of project risk management?
Risk Management
Which of the following is the BEST example of risk TRANSFER as a response strategy?
Expected Monetary Value (EMV) for a single risk event is calculated as:
A Class 4 estimate per AACE 18R-97 is typically used for:
2.4 Job-Site Indirects & Home Office Overhead Allocation
Parametric estimating develops cost using:
The six-tenths rule for capacity-based cost estimating states that the cost of a similar facility at a different capacity is approximately: