History, Theory, Planning, Practice
30%of exam
Utilities, Structural Conceptualization, Building Materials, Technology
30%of exam
Architectural Design and Site Planning
40%of exam
Quick Facts
- Exam
- PRC Licensure for Architects
- Schedule
- Two examination days
- June dates
- June 8 and 10, 2026
- Area I
- 5 hours; 30%
- Area II
- 5 hours; 30%
- Area III
- 10 hours; 40%
- Passing average
- 70% weighted
- Subject floor
- No grade below 50%
- Education
- Recognized BS Architecture
- Experience
- Two diversified years
- Master's credit
- One experience year
Area I Quartet
History, theory, planning, practice share Area I
Program vs Syllabi
PRC Program
- Dates and times
- Subject weights
- Exam-day rules
Board Syllabi
- Knowledge scope
- Area rationale
- Building types
Logistics vs content scope
Practice Document Picker
- Need scope and compensation→Service agreement(Notarized writing)
- Need project requirements→Architectural program(Before design)
- Need concept direction→Schematic design(Initial solution)
- Need coordinated solution→Design development(Refine systems)
- Need form and location→Drawings(Graphic information)
- Need quality requirements→Specifications(Written standards)
- Need construction obligations→Contract documents(Read together)
- Need site resolution→Site development plan(Coordinate whole site)
Architectural History
- Origins
- Beginnings of architecture
- Prehistoric works
- Dolmen menhir cromlech
- Historic styles
- Period centers characteristics
- Western succession
- Ancient through modern
- Asia-Pacific
- Regional architectural development
- Philippine architecture
- Legacies and pillars
- Style influences
- Historical environmental sociocultural
- Heritage work
- Preservation conservation restoration
Statutory Triad
Utility, strength, beauty frame architecture
Drawings vs Specifications
Drawings
- Graphic information
- Form and location
- Dimensions and relationships
Specifications
- Written information
- Quality requirements
- Materials and workmanship
Show work vs describe quality
Design Theory
- Architecture
- Art and science
- Design process
- Transforms needs into form
- Need-specific elements
- Respond to user requirements
- Structural elements
- Support and stabilize
- Circulatory elements
- Organize movement
- Protective elements
- Separate and shelter
- Anthropometrics
- Human body dimensions
- Proxemics
- Cultural interpersonal space
- Tropical architecture
- Climate-responsive design
- Master architects
- Philosophies and works
Design Responsibility vs Construction Supervision
Architect-of-record
- Total project design
- Signs issued documents
- Assumes design liability
Architecture-in-charge of construction
- Construction supervision
- Responsible field direction
- Separate defined role
Design responsibility vs site supervision
Planning
- Planning process
- Classify analyze propose
- Urban planning
- City-scale organization
- Regional planning
- Interlocal development framework
- Comprehensive planning
- Coordinates multiple systems
- Land-use planning
- Allocates compatible activities
- Urban design
- Shapes public urban form
- Human settlements
- Housing policies and production
- Site planning
- Ecological functional spatial response
- Landscape architecture
- Site development and landscape
Anthropometrics vs Proxemics
Anthropometrics
- Body dimensions
- Reach and clearance
- Physical fit
Proxemics
- Interpersonal distance
- Culture affects spacing
- Social comfort
Body size vs social space
Architectural Practice
- Practice statutes
- Regulate professional work
- Professional organization
- Integrated accredited body
- Ethics
- Guides professional conduct
- Service spectrum
- Defines architectural services
- Fees
- Compensate agreed services
- Competitions
- Select design proposals
- Contract documents
- Define construction obligations
- Specifications
- Describe quality and standards
- Quantity surveying
- Measures work quantities
- Project management
- Coordinates resources and delivery
Schematic vs Contract Documents
Schematic Design
- Explores concept
- Tests organization
- Early project phase
Contract Documents
- Defines obligations
- Coordinates construction information
- Later project phase
Explore solution vs direct construction
RA 9266 Roles
- PRBoA
- Regulates architecture practice
- Architect
- Registered and licensed professional
- Architect-of-record
- Responsible for total design
- Architecture-in-charge of construction
- Responsible for construction supervision
- Consulting architect
- Recognized specialist
- Structural conceptualization
- Conceives structural arrangement
- Service agreement
- Notarized scope and compensation
- Professional seal
- Signals document responsibility
- Instruments of service
- Architect's intellectual property
Weighted Average vs Subject Floor
Weighted Average
- Combines three areas
- Must reach 70%
- Uses official weights
Subject Floor
- Applies separately
- No grade below 50%
- Cannot average away
Meet both passing conditions
Eligibility and Rating
- Citizenship
- Filipino or reciprocity-qualified
- Character
- Good moral character
- Degree
- Recognized BS Architecture
- Experience
- Two diversified years
- Experience certifier
- Registered licensed architect
- Architecture master's
- Credits one experience year
- Weighted average
- At least 70%
- Subject minimum
- At least 50%
Utility Family
Water, air, power, sound, safety, signals
Structural Concepts
- Mechanics
- Forces and equilibrium
- Strength of materials
- Stress strain capacity
- Theory of structures
- Structural behavior analysis
- Seismic analysis
- Earthquake response principles
- Timber
- Wood structural systems
- Reinforced concrete
- Concrete plus reinforcement
- Structural steel
- Steel framing systems
- Composite structures
- Combined material action
- Advanced methods
- Emerging construction systems
Materials and Construction
- Civil works
- Site and infrastructure works
- Carpentry
- Timber construction work
- Joinery
- Finished wood assemblies
- Concrete and masonry
- Mineral-based construction
- Sheet metal
- Thin-metal fabrication
- Waterproofing
- Resists water penetration
- Dampproofing
- Controls moisture migration
- Insulation
- Controls heat or sound
- Glass and glazing
- Transparent enclosure systems
- Fenestration
- Openings and assemblies
- Hardware
- Operates and secures components
- Specialized works
- Project-specific construction
Building Utilities
- Water supply
- Source storage distribution
- Plumbing
- Rough-ins and fixtures
- Drainage
- Conveys wastewater and stormwater
- Waste systems
- Disposal treatment recycling
- HVAC
- Conditions and moves air
- Conveyors
- Moves people or materials
- Electrical power
- Supply and distribution
- Illumination
- Lighting quality and quantity
- Acoustics
- Sound control and treatment
- Fire protection
- Detection prevention suppression
- Security systems
- Protect occupants and assets
- Communications
- Voice data audiovisual systems
- Intelligent buildings
- Integrated automated systems
Design Cycle
Program, analyze, synthesize, evaluate, communicate
Planning vs Site Planning
General Planning
- Urban and regional
- Land-use frameworks
- Human settlements
Site Planning
- Specific property
- Buildings and open space
- Circulation and landscape
Broad framework vs project site
Analysis Tool Picker
- Need space quantities→Space schedule(List areas)
- Need space relationships→Adjacency matrix(Near versus separate)
- Need movement logic→Flow diagram(Map users)
- Need site constraints→Site analysis map(Overlay factors)
- Need slope information→Contour map(Read elevations)
- Need sun exposure→Sun-path diagram(Orient openings)
- Need wind direction→Wind rose(Plan airflow)
- Need mass-void pattern→Figure-ground diagram(Compare solids)
Design Method
- Problem brief
- Defines needs and constraints
- Methodology
- Orders design decisions
- Qualitative factors
- Experience character suitability
- Quantitative factors
- Areas dimensions capacities
- Space
- Accommodates activities
- Circulation
- Connects spaces and users
- Interrelationships
- Set adjacency and separation
- Form envelope
- Shapes building volume
- Systems coordination
- Integrates structure and utilities
- Visualization
- Tests spatial solution
- Graphical language
- Communicates design resolution
Site Analysis
- Context
- Surrounding uses and character
- Topography
- Slope and elevation
- Climate
- Sun wind rain heat
- Ecology
- Natural systems and impacts
- Access
- Entries and connections
- Circulation hierarchy
- Separates movement types
- Land use
- Organizes compatible functions
- Landscape
- Shapes open space
- Maintenance
- Supports long-term performance
Building Types
- Residential
- Housing and lodging
- Commercial
- Business and retail
- Mixed-use
- Combines compatible occupancies
- Industrial
- Production and processing
- Educational
- Learning and research
- Healthcare
- Medical and wellness
- Government
- Public administration
- Recreation
- Leisure and culture
- Religious
- Worship and funerary
- Transportation
- Passenger and freight facilities
- Service facility
- Infrastructure support
- Military
- Defense facilities
- Complex project
- Multiple coordinated buildings
June 2026 Exam Day
- Notice of Admission
- Required examination document
- Pencils
- Two or more No. 2
- Ballpens
- Black ink only
- Calculator
- One approved non-programmable
- Calculator check
- Inspected and reset
- Architect scales
- Design day only
- Triangles
- 30x60 and 45-degree
- Protractor
- Design day allowed
- Sketching tools
- Pencils pens erasers
- Scratch paper
- Graphing or bond paper
- NBCP excerpt
- Unmarked Rules VII and VIII
- All papers
- Surrender after examination
Common Traps
Average vs floor
Average must reach 70% ≠ Every subject must reach 50%
Days vs areas
Two examination days ≠ Three weighted areas
Master's credit vs waiver
Master's credits one year ≠ Experience requirement still remains
Official fact vs estimate
PRC program is authoritative ≠ Review-site estimates are unofficial
Degree vs license
Degree supports eligibility ≠ Registration authorizes practice
Calculator allowed vs unlimited
One approved non-programmable calculator ≠ Programmable calculators prohibited
NBCP copy vs notes
Unmarked Rules VII and VIII ≠ Marked copies are confiscated
Last Minute
- 1.Identity: Philippines PRC architect licensure
- 2.Two days; three weighted areas
- 3.Area I: five hours, 30%
- 4.Area II: five hours, 30%
- 5.Area III: ten hours, 40%
- 6.Pass: 70% weighted average
- 7.Floor: every subject at least 50%
- 8.Eligibility: recognized BS Architecture
- 9.Experience: two diversified years
- 10.Architecture master's credits one year
- 11.Use official syllabi scope
- 12.Bring one approved calculator
- 13.Design-day NBCP copy stays unmarked
- 14.Surrender all examination papers
Explore More PRC Philippines Architecture and Planning
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.