Cheat sheet

IMSA Work Zone Cheat Sheet

MUTCD Part 6 Work Zone Standards

Not publishedof exam

Traffic Control Device Placement

Not publishedof exam

Typical Application Diagrams

Not publishedof exam

Typical Application IndexNew Typical ApplicationsFreeway Lane ClosuresBicycle and Pedestrian TAs

Work Zone Safety

Not publishedof exam

Signs and Channelizing Devices

Not publishedof exam

Flagging Operations

Not publishedof exam

Traffic Control Theory

Not publishedof exam

Traffic Flow TheoryMerge StrategyLate vs Early MergeZipper Merge

Quick Facts

Exam
IMSA Work Zone TTC
Questions
100 questions
Time
3 hrs max
Pass score
70
Weights
Not published
Pass rate
Not published
Retake
1 free, within 1 yr
Renewal
3 yrs, 4 CE hrs
Source
MUTCD 11th Ed, Part 6

TTC Zone Order

Warn -> Transition -> Activity -> Termination

Advance warning: inform aheadTransition: redirect the pathActivity: work plus bufferTermination: return to normal

Standard vs Guidance

Standard

  • Verb is shall
  • Mandatory, rarely deviated

Guidance

  • Verb is should
  • Recommended, engineering judgment OK

Required vs recommended

TTC Zone Structure

Advance warning area
Informs road users ahead
Transition area
Redirects normal path
Activity area
Work, traffic, buffer space
Termination area
Returns to normal path
Work space
Closed to road users
Traffic space
Routes road users through
Buffer space
Recovery room, no storage

Statement Verb Cues

Shall = Standard, should = Guidance, may = Option

Standard: mandatory ruleGuidance: recommended practiceOption: permissive onlySupport: informational, no verb

Option vs Support

Option

  • Verb is may
  • Permissive, no requirement

Support

  • Informational text only
  • Never shall, should, or may

Permission vs information

MUTCD Statement Types

Standard
Shall; mandatory rule
Guidance
Should; recommended practice
Option
May; permissive only
Support
Informational; no verb
Standard deviation
Needs an engineering study
Guidance deviation
Needs engineering judgment

Work Duration Categories

Long-term stationary
More than 3 days
Intermediate-term stationary
1 day to 3 days
Short-term stationary
Over 1 hr, one day
Short duration
Up to 1 hour
Mobile
Moves continuously or often
TMP
TTC, TO, PI plans

Taper Length Fractions

Merge = L, shift = 0.5L, shoulder = 0.33L

Merging taper: full LShifting taper: about halfShoulder taper: about a third

Merging vs Shifting Taper

Merging taper

  • Full length L
  • Used for lane loss

Shifting taper

  • About half L
  • Used for lateral shift

Lane loss vs shift

Taper Type Picker

  1. Merging into one laneMerging taper(Length = L)
  2. Lateral shift, no lane lossShifting taper(At least 0.5 L)
  3. Shoulder only, high-speed roadShoulder taper(At least 0.33 L)
  4. Speed 40 mph or lessL = WS2/60(Squares the speed)
  5. Speed 45 mph or moreL = WS(Linear with speed)
  6. One-lane, two-way section50-100 ft taper(~20 ft device gaps)

Taper Lengths and Formulas

Merging taper
At least L, longest
Shifting taper
At least 0.5 L
Shoulder taper
At least 0.33 L
One-lane two-way taper
50 to 100 ft
Downstream taper
50 to 100 ft
L formula, 40 mph
WS2 / 60
L formula, 45 mph+
WS
S definition
Posted or operating speed

Speed Split for L

Square below 40 mph, linear above

40 mph or less: WS2/6045 mph or more: WS

Channelizing Device Spacing

Taper spacing
1x speed limit, ft
Tangent spacing
2x speed limit, ft
One-lane taper devices
About 20 ft apart
Downstream taper devices
About 20 ft apart

Advance Warning Sign Spacing

Urban low speed
100 ft each sign
Urban high speed
350 ft each sign
Rural roads
500 ft each sign
Expressway freeway
1000, 1500, 2640 ft

Buffer and Sight Distance

Buffer space
Optional, lateral or longitudinal
Buffer space rule
No storage or work
Longitudinal buffer sizing
Uses Table 6B-2
SSD at 30 mph
200 ft
SSD at 55 mph
495 ft
SSD at 65 mph
645 ft

Typical Application Index

TA-10
Flaggers on two-lane road
TA-17
Mobile, two-lane road
TA-32
Half closure, high-speed highway
TA-33
Stationary closure, divided highway
TA-35
Mobile, multi-lane road
TA-36
Lane shift on freeway
TA-37
Double lane closure, freeway
Chapter home
6P holds all TAs

New Typical Applications

TA-47
Bike lane, no detour
TA-48
Bike lane, on-road detour
TA-49
Shared-use path, diversion
TA-50
Detour for shared-use path
TA-51
Shoulder closure, bike diversion
TA-52
Circular intersection, short-term work
TA-53
Circular intersection, flagging
TA-54
Circular intersection, lane closure

Class 2 vs Class 3

Class 2

  • Baseline for all workers
  • Standard, day or night

Class 3

  • Night flagger, Guidance level
  • More background material

Baseline vs night flagger

Worker Protection

Positive protection review
Consider at 45 mph+
TMA Test Level 2
70 km/h rated
TMA Test Level 3
100 km/h rated
Power line clearance
10 ft, up to 50kV
Power line, 50-200kV
15 ft minimum

Pedestrian Access

Detection plate top
At least 8 in
Detection plate bottom
At most 2 in
Hand-trailing edge height
32 to 38 in
Alt route width, Option
48 in minimum
Passing space
60 in every 200 ft
Temporary ramp slope
12:1 or flatter

Device Height Rule

Low speed is 18 in, fast is 28

Cones: 18 in day, low speedCones: 28 in freeway or night

Taper vs Tangent Spacing

Taper spacing

  • 1x the speed limit
  • Tighter, more devices

Tangent spacing

  • 2x the speed limit
  • Wider, fewer devices

Half spacing vs full

Device Spacing Picker

  1. Devices set in a taper1x speed limit, ft(Section 6K.01)
  2. Devices set in a tangent2x speed limit, ft(Double the taper rule)
  3. Freeway, high-speed, or night28 in cones minimum(Section 6K.03)
  4. Daytime, low-speed roadway18 in cones minimum(Section 6K.03)
  5. Need 1-mile legibilityType C arrow board(96 x 48 in)
  6. Low-speed urban streetType A arrow board(48 x 24 in)

Channelizing Devices

Cone height, day low-speed
18 in minimum
Cone height, freeway night
28 in minimum
Drum height
36 in minimum
Drum width
18 in minimum
Vertical panel height
24 in minimum
Tubular marker height
18 in minimum
Barricade Type 1 or 2
24 in min length
Barricade Type 3
48 in min length

Sign Sizes and Mounting

ROAD WORK sign, roads
36 x 36 in
ROAD WORK sign, freeway
48 x 48 in
ROAD WORK sign, minimum
30 x 30 in
Sign height, rural
5 ft minimum
Sign height, business area
7 ft minimum
Portable sign clearance
1 ft minimum

Arrow Boards

Type A board
48 x 24 in
Type B board
60 x 30 in
Type C board
96 x 48 in
Type C legibility
1 mile away
Dimming requirement
50 percent minimum
Lane-shift rule
Closures only, never shifts
Caution mode names
Flashing or Alternating Diamond

Paddle vs AFAD Sign

Hand paddle

  • 18 by 18 in
  • Hand-held by flagger

AFAD sign

  • 24 by 24 in
  • Mounted, remote-controlled

Hand-held vs mechanical

Flagging Method Picker

  1. One-lane, two-way, short zoneSingle flagger(Sees end to end)
  2. One-lane, two-way, long zoneFlagger at each end(One flagger coordinates)
  3. Only one approach laneAFAD device(Trailer or gate-arm type)
  4. Flagging at nightClass 3 apparel(Guidance, not a Standard)
  5. Emergency hand-signal onlyRed or orange flag(24 in square minimum)

Flagging Tools

STOP/SLOW paddle
18 x 18 in
Hand signal flag
24 in square min
AFAD STOP/SLOW sign
24 x 24 in
AFAD letter height
8 in minimum
Flashlight use
Left hand, supplements paddle

Flagger Rules

Flagger station placement
Meets stopping sight distance
Apparel for all workers
Class 2 or 3
Night flagger apparel
Class 3, Guidance level
Single flagger allowed
Sees end to end
Two-flagger control
One flagger coordinates

Late Merge vs Early Merge

Late merge

  • Use all lanes
  • Merge at the taper

Early merge

  • Merge as soon as possible
  • Leave the lane early

Zipper vs traditional merge

Traffic Flow Theory

Flow (q)
Vehicles per hour, per lane
Speed (v)
Space-mean speed
Density (k)
Vehicles per mile, per lane
Flow equation
q = v x k
Bottleneck effect
Reduces achievable flow

Merge Strategy

Late merge
Use all lanes to merge
Early merge
Merge as soon as possible
W9-2a
Merge Here Take Turns
R4-9a
Stay In Lane To Merge Point
Zipper merge
Nickname for late merge

Common Traps

Paddle Size vs AFAD Size

Hand paddle: 18 by 18 in AFAD sign: 24 by 24 in

Standard Verb vs Guidance Verb

Standard always uses shall Guidance always uses should

Taper Spacing vs Tangent Spacing

Taper devices: 1x speed limit Tangent devices: 2x speed limit

Arrow Board Closure vs Shift

Arrow boards signal closures only Never used to signal a shift

Class 2 Apparel vs Class 3

Class 2 covers all workers Class 3 is for night flaggers

Single Flagger vs Two Flaggers

Single flagger needs full sightline Two flaggers: one is the coordinator

Buffer Space vs Work Space

Buffer space stays empty, no storage Work space holds crew and equipment

Last Minute

  1. 1.Exam = 100 questions, 3 hrs
  2. 2.Pass = 70; weights = not published
  3. 3.Merging taper = L (full length)
  4. 4.Shifting taper = 0.5L; shoulder = 0.33L
  5. 5.L = WS2/60 at 40 mph
  6. 6.L = WS at 45 mph+
  7. 7.Taper spacing = 1x speed limit
  8. 8.Tangent spacing = 2x speed limit
  9. 9.Cones = 18in low speed, 28in freeway
  10. 10.STOP/SLOW paddle = 18 by 18in
  11. 11.AFAD sign = 24 by 24in
  12. 12.Arrow boards = closures only, never shifts
  13. 13.Chapter 6P = 54 typical applications
  14. 14.Retake = 1 free, within 1 year