Engineers are evaluating two culvert designs for a roadway crossing a salmon-bearing Washington stream. Design A is a round pipe that is cheap to install ($50,000) but accelerates water velocity, preventing salmon passage. Design B is a wide bottomless arch bridge ($180,000) that preserves natural stream velocity and salmon migration. Which decision aligns with Washington state environmental engineering standards?
- ASelect Design B because ecological criteria (salmon passage compliance) outweigh initial…
- BSelect Design A to minimize initial budget costs regardless of fish passage laws.
- CCancel the roadway project permanently.
- DBuild Design A and poison the stream to eliminate salmon.