A three-coat portland cement plaster system is applied over metal lath on a 1,000 sq ft wall. The scratch and brown coats together total 3/4 inch (nominal 3/8 + 3/8). The base coat mix is 1 part portland cement to 3 parts sand by volume. Assuming dry yield equals the wet volume, approximately how many cubic feet of portland cement are required for the two base coats?