A C-28 contractor performs a material takeoff for a 12-door access control installation requiring plenum-rated cable. The measured wire run total is 1,800 feet. Adding a standard 15% allowance for vertical drops, service loops, and waste, how many 1,000-foot cable boxes must be ordered?
- A3 boxes (2,070 ft required)
- B2 boxes (2,070 feet required)
- C4 boxes (2,070 feet required)
- D5 boxes (2,070 feet required)