A 1,200 square foot concrete floor requires a self-leveling underlayment pour at an average thickness of 1/4 inch (0.25 in.). If one 50 lb bag yields 0.45 cubic feet of wet slurry, how many bags are required (excluding waste)?
- A25 bags
- B38 bags
- C56 bags
- D72 bags