A masonry contractor is estimating the quantity of standard 8x8x16 nominal concrete masonry units (CMU) required for a wall measuring 50 feet long by 10 feet high. Allowing a 5% waste factor, how many CMU blocks should be ordered?
Estimating
Question · Easy
According to standard masonry estimating rules of thumb, approximately how many cubic feet of mortar are required to lay 800 standard 8x8x16 CMU blocks with face shell mortar bedding?
Question · Medium
A contractor must solid-grout an 8-inch thick CMU wall having a surface area of 400 square feet. Assuming a grout volume requirement of 0.35 cubic feet per square foot of wall area, how many cubic yards of grout should be ordered?
Trades Exam Prep Podcast
Listen on Spotify
Podcast
How many standard modular bricks (with 3/8-inch mortar joints) are required to build a single-wythe wall measuring 20 feet long by 8 feet high, including a 5% waste factor?
A continuous bond beam requires 3 horizontal runs of #5 rebar along a wall length of 120 feet. If each run requires 4 lap splices of 24 inches each, what is the total estimated weight of rebar required? (#5 rebar weighs 1.043 lbs/ft).
A partially grouted 8-inch CMU wall measuring 600 square feet has cores grouted at 32 inches on center. If grouting cores at 32 inches o.c. requires 0.18 cubic feet of grout per square foot of wall area, how many cubic yards of grout are required?
A 10-foot high by 80-foot long CMU wall requires continuous horizontal joint reinforcement placed every 16 inches vertically (every 2nd course). Allowing 10% extra for lap splices and waste, how many linear feet of joint reinforcement are required?
Question · Hard
Standard estimating guidelines state that laying 1,000 standard modular clay bricks requires approximately how many cubic feet of mortar?
A job specification calls for a 1:3 ratio by volume of Type S masonry cement to damp masonry sand. If a job requires 12 cubic feet of total mortar batch, how many 1-cubic-foot bags of masonry cement and cubic feet of sand are required?
A contractor is installing pre-cast U-lintel blocks over 4 door openings, each having a clear span of 6 feet (total lintel length 8 feet per opening). If each 8-inch U-block lintel holds 0.45 cubic feet of grout per linear foot, what total grout volume is needed for all 4 lintels?
A 50-foot long mason's frame scaffold requires a working platform that is 5 feet wide (composed of 6 nominal 2x10 scaffold planks side-by-side). If 10-foot scaffold planks are overlapped standardly over 5 bays (10 ft each), how many total scaffold planks are needed for a single level?
A masonry retaining wall footing measures 150 feet long, 3 feet wide, and 1 foot 4 inches (1.33 ft) thick. Including a 5% waste factor, how many cubic yards of concrete are required for the footing?
When establishing line and grade for a rectangular CMU foundation using batter boards, which Pythagorean triple is standardly used to verify that wall layout corners are exactly 90 degrees?
Layout Footings
Per the International Building Code (IBC), structural masonry wall footings must extend below what minimum depth unless placed on solid rock?
When placing vertical steel dowels in a concrete footing for a CMU wall, how must the dowels be positioned to align properly with the wall block cores?
According to TMS 602 (Specification for Masonry Structures), what is the maximum allowable variation in elevation from specified level for top of concrete footings supporting masonry?
What is the primary function of a story pole (or gauge rod) during CMU wall construction?
Before pouring concrete footings to support load-bearing masonry walls, native subgrade soil should generally be compacted to what minimum percentage of maximum dry density (ASTM D698 / Standard Proctor)?
What structural purpose does a keyway serve when formed into the top surface of a concrete footing beneath a masonry wall?
Per TMS 602, what is the maximum allowable thickness for the initial starter bed joint of mortar placed on a concrete footing to level the first course of CMU?
When constructing a long CMU wall, why do masons build corner leads (corner pyramids) first before filling in the main line of the wall?
Where a structural expansion joint is detailed in a concrete foundation footing, how must the overlying masonry wall movement joint be detailed?
Per residential building codes, what minimum thickness polyethylene sheet vapor retarder is required under interior slab-on-grade floors abutting foundation masonry?
To verify that a rectangular building layout with side dimensions of 30 feet by 40 feet is perfectly square, what distance must the diagonal string lines measure?
What are the actual manufactured dimensions of a standard nominal 8x8x16 inch concrete masonry unit (CMU)?
Unit Masonry
Per ASTM C90 (Standard Specification for Loadbearing Concrete Masonry Units), what is the minimum required average net area compressive strength for load-bearing CMUs?
Under TMS 602, while standard bed and head joints are specified as 3/8 inch nominal, what is the allowable range of mortar joint thickness for unit masonry during construction?
Per TMS 402, to qualify structurally as running bond, vertical head joints in adjacent courses must overlap by at least what fraction or distance of the unit length?
Where is mortar required to be applied when laying hollow CMU units in standard face shell bedding?
Which mortar joint profile provides the maximum resistance to water penetration on exterior exposed unit masonry walls?
Why are raked mortar joints prohibited or discouraged on exterior load-bearing masonry walls exposed to freeze-thaw climates?
Per standard masonry code provisions, what is the minimum required bearing length of a structural lintel supported on masonry jambs at each side of an opening?
In brick veneer cavity wall construction over wood or steel studs, what is the specified minimum clear air space required between the back of the brick veneer and the weather-resistive barrier?
Per IBC Chapter 21, what is the maximum allowable horizontal spacing for open head joint weep holes located directly above wall flashing in masonry veneer?
Per TMS 402, what is the maximum wall area supported by a single wall tie in anchored masonry veneer?
When installing flexible or metal thru-wall flashing at lintels and base of masonry cavity walls, how should the flashing be terminated at wall edges and lintel ends?
What causes the white powdery deposit known as efflorescence to form on the surface of brick and CMU walls?
When cleaning newly laid clay brick masonry walls with proprietary masonry cleaners or dilute muriatic acid, what critical preparation step must be performed first?
How is the fire resistance rating (in hours) of a hollow concrete masonry unit wall calculated under IBC Chapter 21 and TMS 0216?
Which structural limitation applies to glass unit masonry panels constructed in exterior building openings per IBC Chapter 21?
When installing direct-adhered manufactured stone veneer over exterior wood-framed sheathing, what proper sequence of substrate layers is required?
What distinguishes coursed ashlar natural stone masonry from uncoursed rubble stone masonry?
Why are vertical control joints placed in long concrete masonry (CMU) walls at designated intervals (typically every 20 to 25 feet)?
Unlike CMU walls which shrink, clay brick masonry expands over time due to moisture absorption. What type of movement joint must be provided in long clay brick walls?
In surface-bonded concrete masonry wall construction (ASTM C887), how are the CMU block units installed before applying the fiber-reinforced surface bonding cement?
What is the primary function of masonry coping installed at the top of an exposed parapet wall?
Per IRC Chapter 10, what minimum air space clearance must be maintained between residential masonry chimney exterior walls and combustible wood framing members?
Loading more…