A concrete contractor is estimating the concrete volume required for a building slab measuring 40 feet wide by 60 feet long with a specified thickness of 6 inches. Allowing a 10% waste factor for subgrade irregularities and spillage, how many cubic yards of concrete should be ordered?
Estimating
Question · Easy
How deep before you need a trench box?
Short
A continuous perimeter footing has a total centerline length of 200 linear feet, a width of 24 inches, and a depth of 12 inches. If a 5% waste factor is included in the material takeoff, what is the total volume of concrete required?
Question · Medium
A concrete foundation plan requires 1,200 linear feet of #5 reinforcing steel. Standard #5 rebar weighs 1.043 lbs per linear foot. What is the total estimated weight of the required rebar (excluding lap splices)?
Trades Exam Prep Podcast
Listen on Spotify
Podcast
An estimator must calculate the total concrete volume for 16 circular pier columns. Each pier is 24 inches in diameter and 10 feet deep. What is the total concrete volume needed for all 16 piers (net volume without waste)?
A concrete wall is 120 feet long and 8 feet high. If formwork is required on both sides of the wall, what is the total contact surface area of formwork that must be estimated in square feet?
OSHA fall heights, to scale
A slab-on-grade requires welded wire reinforcement (WWR). The total floor area is 3,600 square feet. Each roll of wire mesh covers 750 square feet gross. Allowing a 10% overlap factor for side and end splices, how many full rolls of WWR must be purchased?
A concrete placement crew places concrete at a rate of 30 cubic yards per hour. The total pour volume is 120 cubic yards. If ready-mix trucks carry 10 cubic yards per load, how many truckloads are needed and at what interval should trucks arrive?
An under-slab vapor retarder is being installed over an 8,000 square foot subgrade. Each roll of polyolefin vapor barrier measures 12 feet by 100 feet (1,200 sq ft gross). Adding a 15% allowance for 6-inch laps and edge turn-ups, how many rolls are required?
A concrete pad measuring 20 ft by 40 ft requires a single mat of #4 rebar spaced at 12 inches on center in both directions, with 3 inches of edge clearance. If rebar is purchased in standard 20-foot lengths and lap splices require 24 inches, how many 20-ft bars are needed for the transverse (20-ft) direction lines alone?
Question · Hard
A concrete contractor must grout 500 cores in an 8-inch CMU foundation wall. Industry takeoff standards estimate that an 8-inch CMU core takes approximately 0.14 cubic feet of grout per vertical foot. If the wall is 8 feet high and all cores are filled solid, how many cubic yards of grout are required (net)?
When establishing batter boards and layout string lines for a foundation excavation, what is the primary reason for setting batter boards back at least 3 to 4 feet from the building corner stakes?
Layout And Excavation
A concrete crew is squaring a building corner layout using string lines. Using the 3-4-5 right triangle method, if one leg measured along the building line is 15 feet, what must the perpendicular leg and hypotenuse measure to ensure a exact 90-degree corner?
An optical level is set up on a jobsite. The rod reading on a benchmark of known elevation 102.50 feet is 4.30 feet (Backsight). If the target bottom-of-footing elevation is 98.00 feet, what should the rod reading be at the bottom of the footing (Foresight)?
Per standard structural specifications and building codes, engineered fill placed beneath concrete footings and floor slabs must typically be compacted to what minimum percentage of maximum dry density determined by ASTM D1557 (Modified Proctor)?
Prior to placing granular base for a slab-on-grade, the contractor proof-rolls the subgrade with a heavy loaded dump truck. What condition indicates an unstable subgrade that requires undercut and stabilization?
Under OSHA 29 CFR 1926 Subpart P, cohesive soil with an unconfined compressive strength of 1.5 tons per square foot (tsf) or greater is classified as which soil type?
What is the maximum allowable slope angle (ratio of horizontal to vertical) for an un-shored trench or excavation up to 20 feet deep in Type B soil according to OSHA safety standards?
When benching an excavation in Type B cohesive soil, what is the maximum allowable vertical height for the first (bottom) bench step under OSHA regulations?
According to OSHA 29 CFR 1926.652, an excavation or trench must be protected by sloping, benching, shoring, or shielding systems once it reaches what minimum depth (unless in solid rock)?
OSHA regulations require excavated materials (spoil piles) and heavy equipment to be set back a minimum distance from the edge of an excavation. What is this minimum required distance?
Per ACI 302.1R and ASTM E1745, what is the minimum recommended thickness for a sheet vapor retarder placed directly beneath an interior building concrete slab-on-grade to resist puncture and moisture vapor transmission?
What type of aggregate layer is specified beneath a slab-on-grade vapor retarder to serve as a capillary break and prevent ground moisture from rising toward the slab?
Under Arizona state law (Arizona 811 / Blue Stake), a contractor must notify underground utility owners prior to beginning any excavation. What is the mandatory minimum advance notice required before digging begins?
In trench excavations that are 4 feet or more in depth, OSHA requires a safe means of egress (such as a ladder, ramp, or stairway). What is the maximum allowable lateral travel distance to an egress point for any worker in the trench?
When excavating footings below the water table, un-controlled water seepage causes quicksand conditions and loss of subgrade bearing capacity. What is the most effective temporary dewatering method for coarse sand subgrades?
In regions of Arizona with highly expansive clay soils (soils that swell when wet and shrink when dry), which foundation layout strategy is commonly specified to prevent structural cracking?
According to the International Building Code (IBC) and Residential Code (IRC), what is the minimum required slope for finished ground surface away from foundation walls?
Under IBC Table 1806.2, what is the default presumptive load-bearing capacity for ordinary sandy gravel or gravel soil in the absence of a detailed geotechnical soil report?
What is the correct procedure for preparing a dry granular subgrade immediately before placing fresh concrete for a outdoor slab-on-grade?
When drilling deep foundation pier shafts in loose, granular, or water-bearing soils, what method prevents wall collapse and caving of the drilled excavation prior to concrete placement?
According to ACI 347 (Guide to Formwork for Concrete), which two primary environmental and operational variables increase the maximum lateral fluid pressure exerted by fresh concrete against wall forms?
Formwork
What catastrophic structural failure occurs if concrete is pumped into tall wall forms faster than the formwork design placement rate limit?
When applying form release agent (form oil) to wall forms prior to concrete placement, what precautionary measure must be observed regarding reinforcing steel?
What is the primary function of snap ties in concrete wall formwork?
Under standard curing temperatures (approx 70°F) and per ACI 301/347 recommendations, what is the minimum typical time after placement before vertical formwork (such as wall and column forms) may be safely stripped?
In multistory elevated concrete building construction, what is the purpose of installing reshores beneath a newly stripped floor slab?
When installing B-B Plyform or MDO plywood panels for concrete wall or slab forms, how should the outer face grain of the plywood be oriented relative to the supporting studs or joists for maximum strength?
What is the primary purpose of placing triangular chamfer strips at external corners of concrete forms?
Per ACI 347, formwork design must incorporate safety factors for form accessories. What is the minimum required design safety factor (ultimate capacity to working load) for form ties used in general wall construction?
According to ACI 117 (Standard Specifications for Tolerances for Concrete Construction), what is the maximum allowable deviation from plumb for specified vertical surfaces of columns and walls up to 10 feet in height?
Why are corrugated paper carton void forms placed beneath structural grade beams when constructing foundations over expansive clay soils?
What issue occurs if wall formwork panel joints are left un-sealed with visible gaps prior to placing high-slump concrete?
Standard United States reinforcing steel bar numbers (#3 through #8) represent bar nominal diameters in eighths of an inch. What is the nominal diameter of a #6 rebar?
Reinforcing Steel
According to ACI 318 Section 20.6.1.3, what is the minimum required concrete clear cover for reinforcing steel in non-prestressed concrete cast permanently against and in contact with earth (such as un-formed footing bottoms)?
Per ACI 318, what is the minimum required concrete cover for #7 reinforcing bars in a concrete wall formed and exposed to weather after form removal?