A contractor must excavate a trench measuring 400 feet long, 6 feet wide, and 8 feet deep. If the undisturbed soil in bank cubic yards (BCY) has a swell factor of 25% when excavated into loose cubic yards (LCY), how many loose cubic yards of material must be hauled away by dump trucks?
- A888.9 LCY
- B711.1 LCY
- C640.0 LCY
- D960.0 LCY