For architectural precast panels, why is joint alignment checked during erection, not only after all panels are set?
- AEarly alignment control allows correction before adjacent members lock in cumulative error
- BJoints are never visible so checks are optional
- CAlignment is only the architect's responsibility after occupancy
- DJoint width has no aesthetic or waterproofing effect