Before steel erection of a metal building begins, the controlling contractor must provide written notification that the concrete in footings, piers, and walls has attained adequate strength and that:
- AAll secondary purlins have already been installed
- BAnchor rods were not repaired, replaced, or field-modified without engineer approval
- CRoof panels are staged on the foundation
- DTemporary bracing cables have been permanently tensioned