Before beginning excavation or pile installation near buried utilities on an Alabama marine project, the contractor should first do which of the following?
- AGuess utility locations from old photographs
- BContact Alabama 811 (One Call) and wait for marks as required by law
- CDig with a large excavator without notification
- DOnly notify utilities after hitting a line