For temporary cover on a construction slope that will be inactive for several months, which approach is most appropriate?
- ALeave bare soil with no protection
- BApply temporary seeding and/or mulch per the erosion-control plan
- CApply only motor oil to waterproof the slope
- DCompact the surface until it sheds all water onto the neighbor