For a tightness test on a low-pressure natural gas installation, what is done immediately after raising the test pressure, before timing the test period?
- AOpen all appliance isolation valves
- BAllow a stabilisation period (typically about one minute) for temperature equalisation
- CApply a strength test pressure
- DPurge the system to atmosphere