A Level IV designer is documenting the sequence of operations for a high-rise project. Which design tool best demonstrates the relationship between each initiating input and every output, including smoke control, elevator recall, and notification?
- AA bill of materials
- BA photometric layout
- CA cause-and-effect matrix
- DA door schedule