Buried utilities (gas, water, fiber, primary cable) inside the planned outrigger and dig footprint should be:
- AIgnored if the dig is shallow
- BLocated and marked through the local one-call system before setup
- CProbed with the auger to confirm depth
- DLocated only after the first hole is dug