An HVHZ home was permitted on March 15, 1994. Under the OIR-B1-1802, what is the inspector likely to record for Question 1 (Building Code)?
- ABuilt in compliance with the FBC and SFBC requirements (HVHZ post-9/1/1994 threshold)
- BNot built to the modern code
- CBuilt to the 2017 FBC
- DUnknown - cannot be determined