A slab on grade was tested with ASTM F1869 calcium chloride three months ago and passed at 2.1 lbs/1,000 sq ft/24 hr. Flooring installation was delayed, and the building envelope was not closed during the rainy season. Before flooring installation, what must be done?
- ARe-test the slab — previous passing results are invalid because the moisture conditions h…
- BProceed with installation because the slab already passed testing three months ago
- CAverage the old result (2.1 lbs) with a spot check in one area to confirm acceptability
- DApply an epoxy coating over the slab as a precaution and install without re-testing