After the brown coat has cured to a hard, plumb surface, before the bond coat is applied, the installer should:
- AApply a curing compound to seal the surface
- BLightly dampen the surface and remove any laitance or loose material
- CCoat the entire surface with latex primer
- DApply a thinned coat of paint as a bond agent