# Minnesota Boiler Engineer License Requirements (2026)

> Find the Minnesota boiler engineer license for your plant and role. Compare Special, Second, First, and Chief limits, check what experience DLI accepts, and see how to apply and prepare.

- Canonical: https://open-exam-prep.com/blog/minnesota-boiler-engineer-license-requirements
- Published: 2026-11-14
- Updated: 2026-11-14
- Author: Ran Chen, EA, CFP®
- Publisher: OpenExamPrep, free exam prep

## Key facts

- Minnesota’s Special Engineer license requires no prior boiler operating experience or affidavit of experience (Minn. R. 5225.0550 and Minnesota DLI).
- Minnesota’s Special Engineer license allows the holder to take charge of boilers rated at up to 50 horsepower (Minn. Stat. § 326B.978).
- A Minnesota Second Class engineer may serve as shift engineer in a plant up to 500 horsepower within the license grade (Minn. Stat. § 326B.978).
- Minnesota’s Chief Engineer license normally requires five years of operating experience, including one year as a licensed First Class engineer (Minn. R. 5225.0550).
- For a low-pressure heating boiler, Minnesota counts a year as 12 months covering heating-season operation and maintenance during the remaining months (Minn. R. 5225.0550).
- The minimum passing score for a Minnesota boiler engineer licensing exam is 70 percent for each license class (Minn. R. 5225.0500).
- The Minnesota Department of Labor and Industry allows 2.5 hours for each Minnesota boiler engineer licensing exam (Minnesota DLI).
- The Minnesota boiler engineer application and exam fee is $50 for each standard class from Special Engineer through Chief (Minnesota DLI).
- An applicant who fails a Minnesota boiler engineer exam must wait at least 30 days to submit a new application (Minn. Stat. § 326B.093).

If you’re at least 18 and new to boiler operation in Minnesota, start with the **Special Engineer** license. You can apply without prior operating experience or an experience affidavit. Submit the application and \$50 exam fee, wait for the Minnesota Department of Labor and Industry (DLI) to approve you to test, and pass the 50-question exam with at least 70%. Applicants ages 16 and 17 must be enrolled in a course approved by the commissioner. [Minnesota’s license statute](https://www.revisor.mn.gov/statutes/cite/326B.978) · [Experience rule](https://www.revisor.mn.gov/rules/5225.0550/) · [DLI class chart](https://www.dli.mn.gov/sites/default/files/pdf/boiler_license_classifications.pdf)

If you already work with boilers or have a job posting that names a license like **2-C** or **2-B**, start with the assignment. Ask what equipment the plant runs, how DLI rates the plant’s horsepower, and whether you would be in charge, working a shift, or assisting under supervision. Those answers tell you which license to investigate. Your documented experience tells you whether you’re ready to apply for it.

## Match the license to the plant and the role

Minnesota has four standard classes for plants that require a licensed boiler engineer. The class sets the horsepower limits for the role. The grade determines which equipment the license covers within those limits. Special has its own scope. For Second, First, and Chief, the employer may write a license as **2C** or **2-C**, for example. Both refer to Second Class, Grade C. [Minn. Stat. § 326B.978](https://www.revisor.mn.gov/statutes/cite/326B.978)

| Minnesota class | Maximum horsepower in charge | Maximum horsepower as shift engineer | Standard operating experience before exam | DLI exam questions |
| --- | --- | --- | --- | --- |
| Special Engineer | 50 hp | 100 hp | None | 50 |
| Second Class | 100 hp | 500 hp | 1 year on an appropriate boiler | 50 for C, 60 for B, 80 for A |
| First Class | 500 hp | Unlimited within grade | 3 years on an appropriate boiler | 100 for C, 100 for B, 130 for A |
| Chief | Unlimited within grade | Unlimited within grade | 5 years on an appropriate boiler, including 1 year as a licensed First Class engineer | 115 for C, 115 for B, 140 for A |

**Grade C** covers low-pressure boilers. **Grade B** covers low- and high-pressure boilers. **Grade A** adds steam engines and turbines. For steam or other vapor, the boundary is 15 psig. A hot-water boiler falls in the high-pressure category if it exceeds either 160 psig or 250°F. Special can cover either boiler pressure category within its role limits. It also permits work as an apprentice at a plant of any size under the direct supervision of a properly licensed engineer. Second Class can assist a shift engineer under direct supervision above its normal shift limit, within the grade’s equipment scope. [Minnesota boiler definitions](https://www.revisor.mn.gov/statutes/cite/326B.95) · [Class and grade authority](https://www.revisor.mn.gov/statutes/cite/326B.978) · [DLI exam counts](https://www.dli.mn.gov/sites/default/files/pdf/boiler_license_classifications.pdf)

Minnesota exempts hot-water supply boilers from the engineer license requirement. If the job listing just says “hot-water boiler,” ask what the equipment serves. A boiler supplying domestic hot water and one heating the building can have different licensing requirements. [Minnesota’s boiler exemptions](https://www.revisor.mn.gov/statutes/cite/326B.988)

### Read a job posting with the plant rating in hand

**Two 45 hp boilers share a header.** If each is rated at 45 boiler horsepower for Minnesota licensing, the plant rates at 90 hp, even when only one boiler is firing. Special fits the horsepower limit for a shift engineer. For taking charge at that low-pressure plant, a 2-C covers the 90 hp and the pressure category. Ask the employer which role the job actually assigns. Minnesota counts all boilers connected to the header, including an idle boiler, so ask for the licensing rating of the whole plant when you see an individual boiler’s nameplate. [Minnesota’s horsepower rating rule](https://www.revisor.mn.gov/rules/5225.1000/) · [Class and role limits](https://www.revisor.mn.gov/statutes/cite/326B.978)

**A 520 hp high-pressure process steam plant needs a shift engineer.** Assume the plant has no steam engine or turbine. A 1-B covers the shift role under Minnesota’s standard classes. A 2-B can assist the shift engineer under direct supervision because the plant is above the 500 hp Second Class shift limit. The plant also has to designate a Chief Class engineer of the proper grade because it exceeds 300 hp. Ask who supervises the shift and who holds the chief designation when a posting uses a title such as “lead operator.” [First and Second Class authority](https://www.revisor.mn.gov/statutes/cite/326B.978) · [High-pressure chief engineer rule](https://www.revisor.mn.gov/rules/5225.0410/)

## Check what experience you can document

For Special Engineer, the state rule calls for a signed application and sets no prior experience requirement. The DLI licensing page gives a general affidavit instruction, and DLI’s affidavit packet explicitly exempts Special applicants. Once licensed, a Minnesota resident planning to advance should save their license record and start logging actual operating experience. DLI’s instructions let Minnesota residents claim experience gained while they held a valid license. Record when you operated the plant, which equipment you worked on, and who can verify the work. [Experience and documentation rule](https://www.revisor.mn.gov/rules/5225.0550/) · [DLI affidavit and instructions](https://dli.mn.gov/sites/default/files/pdf/boiler_engineer_license_affidavit06.pdf)

**For 2-C at a low-pressure heating plant**, a qualifying year is a 12-month period that includes operating the boiler during the heating season and maintaining it during the rest of the year. If your job began partway through the heating season or you changed duties over the summer, map your dates and duties before counting the year. DLI’s affidavit instructions include a completed low-pressure steam plant entry to show how to record horsepower, working pressure, and both dates. [Experience rule, subpart 10](https://www.revisor.mn.gov/rules/5225.0550/) · [DLI’s completed 2-C example](https://dli.mn.gov/sites/default/files/pdf/boiler_engineer_license_affidavit06.pdf)

**For a high-pressure upgrade**, a year is at least 2,000 hours of qualifying experience. The DLI chart lists 2,000 boiler operating hours for 2-B, 6,000 for 1-B and 10,000 for Chief B. A year on payroll can include other maintenance duties, so track the actual qualifying hours. Grade A requires high-pressure boiler experience that includes time operating a steam engine or turbine. Second Class Grade A calls for one year of that equipment experience within the required boiler year. First Class and Chief Grade A call for at least two years of it within their required boiler experience. [Grade A and time requirements](https://www.revisor.mn.gov/rules/5225.0550/) · [DLI class chart](https://www.dli.mn.gov/sites/default/files/pdf/boiler_license_classifications.pdf)

### What to bring to the person signing your affidavit

- **Your work record.** Bring the plant name and location, your operator license number, and exact start and end dates. Note your duties and high-pressure or engine and turbine hours where applicable.
- **The right plant data.** For steam, bring the licensing horsepower and maximum working pressure. For hot water, gather the boiler rating, pressure and temperature. Use the rating DLI applies for licensing, including its calculation rules when heating surface is unavailable.
- **A verifier who knows your work.** DLI asks the plant’s Chief Engineer to sign when there is one. The rule allows a notarized DLI affidavit signed by the owner, employer, or a holder of a valid Minnesota Second Class or higher operating engineer license. Review the completed form before filing and keep a copy. [DLI affidavit](https://dli.mn.gov/sites/default/files/pdf/boiler_engineer_license_affidavit06.pdf) · [Minn. R. 5225.0550, subpart 9](https://www.revisor.mn.gov/rules/5225.0550/) · [Horsepower rating rule](https://www.revisor.mn.gov/rules/5225.1000/)

Rule 5225.0550 also allows verified military or maritime records and a qualifying notarized employer letter. Applicants claiming experience from a jurisdiction that requires a license must show they complied with that jurisdiction’s licensing requirements. Experience generally needs to fall within the 10 years before applying. If a past employer has closed or your record falls outside that period, ask DLI which documentation the chief boiler inspector can consider before paying the exam fee. [Minn. R. 5225.0550, subparts 1 and 9](https://www.revisor.mn.gov/rules/5225.0550/)

## Apply, take the exam, and pay for license issuance

1. **Apply for the specific class and grade.** Open DLI’s licensing page for the iMS application or use its paper exam form. Pay the nonrefundable \$50 application and exam fee. Submit the experience documentation for an initial Second, First, or Chief application. [DLI boiler engineer licensing](https://www.dli.mn.gov/workers/boiler-engineer/licensing-boiler-engineer) · [DLI exam application](https://www.dli.mn.gov/sites/default/files/pdf/BoilerPacket.pdf)
2. **Schedule after approval.** DLI emails instructions for booking in iMS. Take the exam within one year of the eligibility notification. If you miss the scheduled exam, you can reschedule once within that same one-year window. Check iMS for dates that offer your exam at the location you want. [DLI exam scheduling](https://www.dli.mn.gov/business/get-licenses-and-permits/license-exam-schedule) · [Minn. Stat. § 326B.093](https://www.revisor.mn.gov/statutes/cite/326B.093)
3. **Use the time limit for your exam.** DLI allows 2.5 hours for all boiler exams, and the passing score is 70%. The question count in the table helps you set a practice pace. If you fail, wait at least 30 days from the exam date to submit a new application and fee. DLI’s retest form instructions waive the affidavit for a retest. [DLI time limits](https://www.dli.mn.gov/business/get-licenses-and-permits/license-exam-schedule) · [Passing-score rule](https://www.revisor.mn.gov/rules/5225.0500/) · [Reapplication statute](https://www.revisor.mn.gov/statutes/cite/326B.093) · [DLI exam application](https://www.dli.mn.gov/sites/default/files/pdf/BoilerPacket.pdf)
4. **Pay the separate fee after approval.** The two-year license costs \$20 for Special, \$40 for Second or First, and \$80 for Chief. With one exam application, that comes to \$70, \$90, or \$130 in state fees respectively. Pay within 180 days of DLI’s license approval notification so the department can issue the license. [DLI fee schedule](https://www.dli.mn.gov/sites/default/files/pdf/fees.pdf) · [License issuance statute](https://www.revisor.mn.gov/statutes/cite/326B.093)

## Study for the license you picked

For **Special**, start with DLI’s Special Engineer study material and practice explaining what the safety valve, low-water cutoff, and operating controls do. Use DLI’s steam and hot-water diagrams to name the components on each type. Then take a set of [free Minnesota boiler engineer practice questions](https://open-exam-prep.com/practice/mn-boiler-operator) from OpenExamPrep. When you miss a licensing question, write down whether the role, plant horsepower, or equipment changed the answer. [DLI study materials by license](https://www.dli.mn.gov/workers/boiler-engineer/boiler-and-historical-boiler-licensing-books) · [DLI boiler diagrams](https://www.dli.mn.gov/sites/default/files/pdf/boiler-safety.pdf)

For an **upgrade**, review DLI’s Second Class through Chief statutes and rules alongside the reading list for your grade. For application deadlines, use the current statute and DLI’s scheduling instructions. A 2-C candidate can start with low-pressure operation and the Minnesota rules on licensing and recordkeeping. For Grade B, use the high-pressure reading list. For Grade A, give steam engines and turbines their own study block. DLI’s chart says Grade A exams also include Grade B material. Use the [Minnesota Boiler Engineer study guide](https://open-exam-prep.com/study-guides/mn-boiler-operator) to revisit the topics you miss, then work through a fresh practice set and explain each answer in your own words. [DLI reading list](https://www.dli.mn.gov/workers/boiler-engineer/boiler-and-historical-boiler-licensing-books) · [DLI exam chart](https://www.dli.mn.gov/sites/default/files/pdf/boiler_license_classifications.pdf)

## FAQ

### Can I apply for a Minnesota Special Engineer boiler license with no experience?

Yes. Minnesota requires no prior operating experience or affidavit for Special Engineer. Applicants at least 18 can apply and pay the exam fee. Applicants ages 16 and 17 must also be enrolled in a commissioner-approved course.

### What is the difference between Minnesota’s 2-C and 2-B boiler licenses?

Minnesota’s 2-C covers low-pressure boilers. The 2-B covers low- and high-pressure boilers. Both allow up to 100 horsepower in charge or 500 horsepower as shift engineer within the applicable grade.

### Can a Minnesota Special Engineer work on boilers above 100 horsepower?

Yes, as an apprentice under direct supervision of a properly licensed engineer. Special allows up to 100 horsepower as a shift engineer and up to 50 horsepower in charge.

### Does one year at a Minnesota boiler plant qualify me for 2-C?

A qualifying year on a low-pressure heating boiler includes operating it during the heating season and maintaining it for the rest of a 12-month period. Minnesota residents must document qualifying work performed while licensed.

### How much does a Minnesota boiler engineer license cost after I pass?

Minnesota DLI charges a separate two-year license fee of $20 for Special Engineer, $40 for Second or First Class, or $80 for Chief. The application and exam fee is $50.

### How long is the Minnesota Special Engineer boiler exam?

Minnesota DLI allows 2.5 hours for the 50-question Special Engineer exam. The minimum passing score is 70 percent.

### When can I retake a failed Minnesota boiler engineer exam?

Minnesota requires at least 30 days after the failed exam before you submit a new application. The DLI retest form calls for a new application and fee and waives the affidavit.

## Study free on OpenExamPrep

- Minnesota Boiler Operator: [Practice questions](https://open-exam-prep.com/practice/mn-boiler-operator) · [Study guide](https://open-exam-prep.com/study-guides/mn-boiler-operator) · [Flashcards](https://open-exam-prep.com/flashcards/mn-boiler-operator) · [Cheat sheet](https://open-exam-prep.com/cheat-sheet/mn-boiler-operator)
